Send your construction pics to content_at_themeparxdotcom

Volcano Bay
Views: 363,879

Post an Update
Page 7 of 18 First Page ... 3 4 5 6 7 8 9 10 11 ... Last Page
Posts 61 - 70 of 174
Local Name:
Volcano Bay
Budget:
$600M
Announced:
28 May 2015
Construction Start:
28 May 2015
Opening:
25 May 2017
Location:
Area:
11 ha
  1. HazelJune is offline themeparX Top Investigator
    Join Date
    Jan 2017
    Posts
    233
    The latest aerials from Mickey Extreme.






    More pictures are available on this page: http://mickeyxtreme.net/blog/new-universal-orlando-s-volcano-bay-aerials

  2. HazelJune is offline themeparX Top Investigator
    Join Date
    Jan 2017
    Posts
    233

  3. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,686
    Here's just some of @bioreconstruct's lastest aerial photos of Volcano Bay:









    Source: http://twitter.com/bioreconstruct/

  4. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,504
    An event was held yesterday to show off the food choices of Volcano Bay.

    Culinary offerings were inspired by the islands such as Tahiti and the Caribbean. Universal has a wide variety of offerings for guests, including grab and go items. The cuisine is just a portion of the entire experience at Volcano Bay. With more than 60 different dishes across five dining locations, there is surely something for everyone. Dishes will range from pizza to sushi to jerk chicken.


    According to Ric Florell, the culinary experience will be the exclamation mark to the experience. Similarly to The Wizarding World of Harry Potter and Springfield, the food at Volcano Bay will be a big part of the experience. “Imagine walking around and not having Butterbeer,” says Florell.


    Source: http://www.behindthethrills.com/2017/04/universal-orlando-previews-food-offerings-for-volcano-bay/?utm_source=feedburner&utm_medium=feed&utm_campaign=Feed%3A+behindthethrills%2Fnews+%28Behind+the+Thrills+News%29


  5. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,686

  6. HazelJune is offline themeparX Top Investigator
    Join Date
    Jan 2017
    Posts
    233


    The base of Krakatau Mountain continues to see scaffolding being removed and we now see more details. The pathway coming out of the volcano has some great mossy details nearby


    Over by Runnamukka Reef, rock-work continues to develop around the lazy river cave and around the water coaster above:



    Source: http://www.wildgravitytravels.com/volcano-bay-waterpark-construction-update-26-universal-orlando-resort/

  7. HazelJune is offline themeparX Top Investigator
    Join Date
    Jan 2017
    Posts
    233
    New videos showing the progress of the park's construction:





  8. HazelJune is offline themeparX Top Investigator
    Join Date
    Jan 2017
    Posts
    233

  9. HazelJune is offline themeparX Top Investigator
    Join Date
    Jan 2017
    Posts
    233
    Update as of March 23:





  10. HazelJune is offline themeparX Top Investigator
    Join Date
    Jan 2017
    Posts
    233
    Construction Update:



    The volcano without the scaffolding:


    One the back-side work continues on the stairs leading to the Ko’Okiri Body Plunge capsule slides:



    Other great photos can be found here: http://www.wildgravitytravels.com/volcano-bay-waterpark-construction-update-25-universal-orlando-resort/

Page 7 of 18 First Page ... 3 4 5 6 7 8 9 10 11 ... Last Page

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts