Send your construction pics to uploads @ themeparx.com

Reply to Thread
Page 2 of 17 FirstFirst 1 2 3 4 5 6 ... LastLast
Posts 11 - 20 of 165
Local Name:
Vidanta World
Former Name(s):
Celebrate Project, The Park
Budget:
3.5B
Announced:
12 Nov 2014
Construction Start:
Sep 2015
Opening:
2023
Area:
47 ha
Developer:
Grupo Vidanta
Operator:
Grupo Vidanta, MR ProFun
Consultants:
Contractors:
Other Suppliers:
  1. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,074
    Quote Originally Posted by Guest View Post
    I could be wrong about that of course. (It does look like a ride, but I was there a few weeks ago and they were doing construction on the new bridge in that vicinity) In any event, thanks for your posts Michael. I follow the developments and your intel is very much appreciated.
    Thank you I'm glad that you appreciate my posts! At the beginning of the video I thought it was showing Vidanta World's SkyDream station on the back right and the back left was the theme park so the person filming the video was standing north east of the newly built tennis courts on the north side of the Ameca River. Where are you thinking the video was taken from and which SkyDream station is that in the video?

  2. I was there 30 days ago

    This video seems to be before the gondola stop by the KOS and the entrance to the park. They were pouring concrete foundations when I was there last. I was told this area was getting flooded but it doesn’t make sense looking at the elevations of walkways

    Also there are plans for a new or widened golf bridge connecting the new estates to the existing resort

    Douglas

  3. I could be wrong about that of course. (It does look like a ride, but I was there a few weeks ago and they were doing construction on the new bridge in that vicinity) In any event, thanks for your posts Michael. I follow the developments and your intel is very much appreciated.

  4. I believe this is for the 2nd bridge being built to connect the new Estates units which are on the other side of the Ameca River. Not directly Park related, but does show continued development.

  5. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,074

  6. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,074
    Some interesting developments...





    New Vidanta World Facebook page and website:



    Here's a link to the Facebook page: https://www.facebook.com/VidantaWorld/ and here's the new website: https://www.vidantaworld.com/

    Sources: https://www.instagram.com/p/CNGoF24AcCY and https://goo.gl/maps/T1XR2L7gLhVJc8At8

  7. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,074
    An interesting new Vidanta World sign going up by the main road:



    Source: https://www.facebook.com/luis.m.reyes.73/posts/10159316864837458

  8. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,074

  9. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,074

  10. Theme Park Design is offline themeparX Top Investigator
    Join Date
    May 2020
    Posts
    83

    Water Park Design: Cirque du Soleil Concept Art by Legacy Entertainment

    In earlier iterations of the project wherein the main component of Phase 1 was to be a Water Park, Legacy Entertainment collaborated with Cirque du Soleil and WhiteWater to develop a groundbreaking water park filled with brand new attractions, as well as new takes on old classics. One area of the park was inspired by Disney's shuttered 'River Country' water park, and would have featured a variety of participatory activities, including rope climbs, zip lines, rope & trapeze swings, along with a few waterslides integrated into the elaborate rockwork berm.




















Page 2 of 17 FirstFirst 1 2 3 4 5 6 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts