Construction of the transit station being built at Universal Beijing is coming along nicely. The main frame of the steel wavy design is expected to be completed on October 20 and the transit station is scheduled to begin trial operations at the end of 2019. The transit station is connected to CityWalk which leads to the theme parks, waterpark, and hotels.
Sources: http://www.bjtzh.gov.cn/n95/n534/n710/c16809580/content.html and https://mp.weixin.qq.com/s/wlm2EWWVgr6NzyNI1DxxTw