Page 105 of 118 First Page ... 101 102 103 104 105 106 107 108 109 ... Last Page
Posts 1,041 - 1,050 of 1175
Local Name:
北京环球影城
Budget:
$6.5B
Announced:
12 Feb 2009
Construction Start:
31 Oct 2016
Opening:
20 Sep 2021
Area:
42 ha
Developer:
Beijing Shouhuan Cultural Tourism Investment Co.,
  1. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,510
    More general construction news from the overall project.

    1. The re-routing of the rivers and the creation of a new riverside park will act as a tourist zone around the theme park as well as providing the water features inside the park. The red dotted area is Universal Studios as far as I can make out from the map and descriptions.

    The landscape improvement project is expected to reach the completion acceptance condition in September, which will not only increase Xiaohe River's flood control standards, provide flood protection security for Universal Studios, but also provide a new landscape for the public to enjoy water and leisure.
    After planning and designing, this river channel will serve as the landscape water body within Universal Studios


    Source: http://www.takefoto.cn/viewnews-1379818.html

    2. There has been some backlash from the villagers who were relocated from the area in 2013 and are yet to have their new houses completed. These relocated villages will sit around the perimeter of the new park. Those villages were meant to be completed by 2015 and whilst some have been, many are still living in temporary accomocation.

    At present, the land required for the Universal Studios theme park project has been demolished and retired. The surrounding area has been enclosed by a wall. A part of the land is under construction and most of the land is covered with green gauze.
    According to the official from Liyuan Town mentioned above, Sunzhuang Village in Liyuan Town also adopted a village collective self-built resettlement housing. “It was also built and was stopped. In this (Universal Studios Theme Park) project, our town should be based on these two villages. It seems that Zhangjiawan Town also has a village villager who has not moved back and resettled, and most of them have completed resettlement by the end of 2015."
    Source: https://www.jiemian.com/article/1739968.html

  2. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    7,096
    Photo of the site from earlier this month:



    Source: https://www.sohu.com/a/220234934_100014700

  3. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    7,096
    New photos of the site from the night of January 16, 2018















    Source: http://www.sohu.com/a/217159454_100014700

  4. Sebastian is offline themeparX Top Investigator
    Join Date
    Feb 2017
    Posts
    125




    Accompanied by the president of Beijing Construction Engineering Grp., @m_raman visited the Universal #Beijing Theme Park + Resort site last week. The #soil #recycling program was amazing!
    Source:
    https://twitter.com/usgbc/status/953385491373715456

  5. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    7,096
    Progress continues on Universal Beijing as earlier this week, the Beijing Municipal Bureau of Industrial and Commercial Administration officially issued a business license to "Universal Beijing Resort Limited."

    Source: http://tzcj.bjtzh.gov.cn/n12073449/c15656118/content.html

  6. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    7,096
    There appears to be some "safety hazards" recently at the construction site but an investigation is taking place and officials are working to "remedy" the situation

    Source: http://www.bjtzh.gov.cn/n95/n534/n725/c15543720/content.html

  7. No details, but seems not big issue since the news says project runs smoothly.

  8. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    7,096
    Quote Originally Posted by Guest View Post
    Mr. Hightower fully affired the report and said that he would try his best to help solve the problem
    What problem is he trying to solve?

  9. Universal Bejing project is progressing smoothly. At present, more than 90% construction drawings have been completed and passed 4 reviews of US side.

    Mike Hightower, the Senoir Vice President and Executive Project Director of Universal Parks and Resort Group visited BEIJING INDUSTRIAL DESIGNING AND RESEARCHING INSTITUTE on Nov.12,2017, with more than 30 senior technical managers of UD and JVC company. In the meeting, Mr. Hightower fully affired the report and said that he would try his best to help solve the problem and promote the project.

  10. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    7,096

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts