    Latest update:

    The Forest Park is located on the north side of the Jubilee Plate and has a total planning area of ​​about 2,000 mu. It is designed with 17 different theme zones , including Forest Avenue, Giraffe Area, Giraffe Castle, 5D Cinema, Flying Theater, Large Equestrian Performance Area, and "Monster Hunt" movie themed area. Combining animal displays, amusement projects, and performing special effects organically, creating a super theme park with the theme of forests and the harmonious coexistence of humans and animals. The forest park is designed to receive 8 million visitors each year, 55,000 people on peak days, 24 major amusement facilities, 6 animal exhibition areas, and 6 large-scale theaters (stadiums).

    At present, the construction of two roads in the park has been completed. The front parking lot, park entrance, and Giraffe Castle, the core building of the Forest Park, are being excavated. The construction of comprehensive pipeline corridors and flood discharge channels in the park continued to advance in an orderly manner.
    The theme hotel clusters are located in the entrance area of ​​the Forest Park, with a planned land area of ​​approximately 900 acres. The hotel is designed with a total of 4,500 guest rooms, including the Giraffe Hotel, Elephant Hotel, Zebra Hotel, Rhino Hotel and International Conference Center, and indoor water park. 7000 car parking spaces and 5000 square metre banquet hall.

    At present, the foundation pit support project for parking lots in the front of the hotel complex has been fully completed, and the construction of the hotel group has been proceeding in an orderly manner. The first phase of the project is planned to be completed and opened in 2019.
    Source: https://www.xuehua.us/2018/06/09/%E9%95%BF%E9%A2%88%E9%B9%BF%E5%9F%8E%E5%A0%A1%E5%BC%80%E6%8C%96%E5%9F%BA%E6%A1%A9%EF%BC%8C%E6%B8%85%E8%BF%9C%E9%95%BF%E9%9A%86%E6%9C%80%E6%96%B0%E8%BF%9B%E5%B1%95%E5%87%BA%E7%82%89%EF%BC%81%E5%BB%BA/

  2. Nathan Kane is offline New User
    Join Date
    May 2018
    Posts
    1
    It is said that the project has slowed down. Also, there is a rumor that GGE has been removed from the project. I was looking forward to this project. It was supposed to be another big piece of work from GGE. But I heard that GGE is working on another theme park project in China, the Evergrande Fairytale world.

  3. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,323
    New high resolution layout of Chimelong Qingyuan Forest Resort

    A few attractions can clearly be identified in the layout including a 5D theater, a kiddie roller coaster, a central body of water for shows, a tiger-themed river rapids (fun fact: originally Disney's Animal Kingdom's river rapids was going to be tiger-themed), and a hippopotamus-themed log flume/splashdown-type ride. I am not able to spot the previously announced signature giraffe castle, world's largest aviary, and hilltop observation wheel. Can anyone spot any of those?



    As of March 2018, land has been completely cleared for the four resorts that can be seen in the top right of the layout. The two resorts located along the animals exhibits are currently under construction. Little to no land clearing has taken place so far for the theme park itself.

    Note the waterpark layout pictured below and in the top right of the main layout. I spot about 10 waterslides, a large lazy river, two wave pools, and an aqua coaster.



    Source: http://www.gdqy.gov.cn/frontapp/ghj/pqgs/detail.jsp?keyword=&sdate=&edate=&curPage=11&pageSize=10&num=7

  4. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,323

  5. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,323
    New satellite imagery from earlier this month shows that construction is progressing but very slowly.



    Also new concept art for the theme park's huge giraffe castle and nearby zebra-themed hotel has been released:





    Source: http://www.sohu.com/a/220572538_773723

  6. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,323
    Quote Originally Posted by bigT View Post
    Any word on current project status? Apparently the resort is having some serious problems, and I heard that it might have been cancelled?
    It is not cancelled - permits and plans as recently as this month keep getting submitted for the park. Example: http://www.qyup.gov.cn/cxghj/cags/201802/afc8fdc0506c4eae884d2ba35b457429.shtml

  7. bigT is offline New User
    Join Date
    Feb 2018
    Posts
    1
    Any word on current project status? Apparently the resort is having some serious problems, and I heard that it might have been cancelled?

  8. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,323

  9. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,499
    There's a new train line slated for opening alongside the resort.



    According to the plan, the green line from the Guangqing Industrial Park in the northeast, followed by the Merrill Lynch Lake, Silver Light characteristics of the town, Changlong Forest Resort theme park, to Changlong South China tiger provenance base.
    The project will be built in two phases, the initial realization of Guangqing inter-city silver station and Changlong theme park connectivity, later through the east and west to extend the two directions. The initial project line is 8.55 kilometers long, with 3 stops. Respectively, silver lamp, long Avenue, long theme park.
    Source: http://www.gdqy.gov.cn/gdqy/wlyzx/201704/b414b3905ecf4085be3d26cb25e94f56.shtml

  10. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,323
    Construction progress from May 2017:





    Phase 1 will be completed by the end of 2019

    Source: http://www.0763f.com/news/folder148/2017-05-19/235805.html

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts