SeaWorld Abu Dhabi
Views: 643,083

Post an Update
Page 28 of 36 First Page ... 24 25 26 27 28 29 30 31 32 ... Last Page
Posts 271 - 280 of 354


















  1. Quote Originally Posted by parkfan View Post
    I have all the official concept art that I cannot distribute due to confidentiality. I can tell you that those released on January 20 are not official. Everything is very different. I think these concept art are for another park
    Parts of the design such as the yellow "pods" match a rendering and layout that I have from last year so maybe it's an early design compared to the official concept art that you have.

  2. parkfan is offline themeparX Top Investigator
    Join Date
    Oct 2019
    Posts
    28
    I have all the official concept art that I cannot distribute due to confidentiality. I can tell you that those released on January 20 are not official. Everything is very different. I think these concept art are for another park


  3. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,726
    The park will be indoors over five levels: Service Level 01, Service Level 02, Attraction Level 03, Attraction Level 04, Attraction Level 5. The theme park is divided into six major areas, Abu Dhabi Ocean, Polar Ocean, Tropical Ocean, Endless Ocean, Sea of Delight and Blue World. In addition to the main building, there are ancillary building outside the main building.

    The site is approximately 54 hectares, of which Miral plans to develop approximately two thirds of the area for SWAD at this time. This portion of the site will allow for future expansion of SeaWorld. The remaining one third will be reserved for future development.
    I'm not sure when this photo was taken so it might be out of date:



    Source: https://www.ellisdon.com/project/seaworld-abu-dhabi/

  4. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,504
    National Central Cooling Company (Tabreed) will build and operate a new dedicated plant at the SeaWorld Abu Dhabi site by 2022.
    Once completed, “the development will benefit from a reliable, technologically advanced and sustainable source of cooling interconnected to the Yas Island centralised cooling scheme”, said Tabreed.

    Under the terms of a deal agreed with developer Miral, Tabreed will connect the new SeaWorld Abu Dhabi development to its existing Yas Island district cooling scheme while the new plant is under construction. This will deliver a cooling capacity of 7,500 refrigeration tons with a total concession capacity of 15,000 refrigeration tons (RT).
    Gurjit Singh, chief portfolio officer at Miral added: “We are pleased to be expanding our partnership with Tabreed, a state-of-the-art cooling infrastructure on Yas Island, delivering crucial cooling services to many of our award-winning theme parks. SeaWorld Abu Dhabi is set to be Yas Island’s next mega attraction, and with this agreement, we ensure the continuous delivery of trusted, reliable and energy-efficient services to our growing portfolio of developments. This is yet another step towards our vision of positioning Yas Island as a top global destination for leisure and entertainment.
    Source: https://meconstructionnews.com/45497/tabreed-to-build-and-operate-a-new-district-cooling-plant-at-seaworld-ad-after-sealing-miral-deal

  5. Lucid_Tornado is offline Senior Park Investigator
    Join Date
    Oct 2020
    Posts
    24
    Is there any news on the roller coasters? Like the name, manufacturer and model? I would love to see some updates or at least expect them early 2021.

  6. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,726

  7. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,726







Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts