Send your construction pics to content_at_themeparxdotcom

Search Results:

Type: Posts; User: Jordan Ong

  1. Posts
    1,569
    Views
    3,602,293
    Evacuation platform.
  2. Posts
    1,569
    Views
    3,602,293
    I think the glass materials imported are from a cheap source due to soaring inflation, in my opinion.
  3. Posts
    1,569
    Views
    3,602,293
    No comment. Roller coaster construction and opening also face delays and its difficult to predict when it will debut and the period of ride test and other safety measures needed to be implemented before opening.
  4. Posts
    1,569
    Views
    3,602,293
    https://youtu.be/xESXEP6gMk0?si=vjXfdsqGPtNwIyrq

    According to this video, the Bolt powered coaster has been going through testing for a long period of time.

    It’s cancelled last year. Same time as Big Top Video Games Park.

    Why? You may ask. Possibly to conserve cash.

    So Q2 2025, the evacuation platform is installed and set up (fully completed).

    After that, RWG invested into staff training to conduct cycling tests.
  5. Posts
    1,569
    Views
    3,602,293
    The signature Mad Ramp Peak ride 🏍️ is opening in Q4 2026 due to engineering work and ride testing according to one of the park’s managers.
  6. Posts
    1,569
    Views
    3,602,293
    Quote Originally Posted by user View Post
    The Bolt powered coaster at Skytropolis Indoor Theme Park has begun testing



    https://maps.app.goo.gl/gsvsusDVhV8FZJMW8
    That’s great news. I look forward to visiting the park again in December.
  7. Posts
    915
    Views
    4,139,820
    Spoke to the executive director during my recent visit to my favourite park (Sunway Lagoon).

    He shared with me the new park at Sunway Iskandar Malaysia is starting construction in Q1 2026.

    It will have a dry park, wet park and an indoor game area/ mall according to the concept art.

    The mall will have gaming areas (good for people who want to escape the heat) with shopping areas and food courts.

    The wet park will feature blue tube slides and possibly indoor pools.

    While the dry park will have a giant Ferris Wheel, red rollercoaster and lightshow with fountain.
  8. Posts
    114
    Views
    264,597
    This short video show the park’s demolition starting from 7 September 2024 until now. This is according to the new Chief Minister Saarani bin Mohamad. 😭😢

  9. Posts
    1,569
    Views
    3,602,293
    Looks like most components are ready but it’s unknown why it’s not open.
Results 1 to 9 of 9