Send your construction pics to uploads @ themeparx.com

Reply to Thread
Page 11 of 62 ... 7 8 9 10 11 12 13 14 15 ...
Posts 101 - 110 of 618
Local Name:
Budget:
Announced:
Construction Start:
Opening:
Location:
Worldwide
Area:
Developer:
Operator:
  1. thethemeparkguy is offline themeparX Top Investigator
    Join Date
    Feb 2012
    Posts
    55
    Here is a map showing theme park & resort projects that haven't stopped.

    Just posted on LinkedIn:
    https://www.linkedin.com/posts/stefanzwanzger_heres-something-positive-a-map-showing-activity-6663488483945967619-2CNz


  2. Legacy Entertainment has been collaborating with China's Keystone Group on the Concept Design and Master Planning of Sanya's upcoming Hello Kitty theme park and Haitang Bay Resort. The project was announced in July 2019, and is slated to open in 2024. Park of an integrated resort district located in Haitang Bay, the project site is located just minutes away from Fosun's Atlantis Sanya resort, and will boast multiple family hotels connected by a Retail, Dining, & Entertainment promenade.






























  3. Since San Diego's Belmont Park was revitalized in 1990, it has remained largely unchanged, save for the addition of several flat rides. A few years ago, the park's owners engaged Legacy Entertainment for an exploratory exercise to look at ways in which the park could be revitalized and brought into the 21st century. The design approach depicted in these images was inspired by the client's prompt of "Celebrating San Diego of the Past, Present, and Future", with different themed districts representing each of these time periods. If you grew up in San Diego, you may recognize re-creations of some of the city and park's most fantastical lost architecture.
























  4. Beyond Vidanta's Mexico Nuevo Vallarta project, Cirque du Soleil and Legacy Entertainment have collaborated on a wide array of theme park and resort project proposals around the world. These breathtaking illustrations depict one such design for a mega integrated resort in Southeast Asia. For this project, WhiteWater collaborated closely with the Cirque and Legacy teams to help develop what would have been the "Water Park of the Future".
























  5. CarlySX is online now themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,322
    Paultons Park announced they are postponing their new land until 2021.

    Tornado Springs will now open Easter 2021. We are so sorry to have to delay the opening of our amazing new land. Everyone who has been involved in the project has poured their heart and soul into creating a spectacular experience, so rest assured it will be worth the wait.

  6. VDNH theme park in Moscow. Rides mostly EU-manufactured. Slightly delayed, but on course to open this or next year.









  7. CarlySX is online now themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,322
    Xuzhou Amusement Land is part of the overall Xuzhou Paradise Resort in China which was due to open in March 2020 but is delayed.

    An update from Xuzhou Paradise where test openings have begun. The park features a custom mine train along with an SLC and spinning coaster from Golden Horse. The star of the show though will be the Mack built Blue Fire clone.




    Source: https://twitter.com/VHCoasters/status/1251812625475874816

  8. ragerunner is offline themeparX Top Investigator
    Join Date
    Jul 2018
    Posts
    90

    Walt Disney World Construction Update April 2020

    Here is a look at all the current active construction projects at Walt Disney World as well inactive construction projects. This includes hotel towers, a new solar powered McDonalds, road projects, Cinderella Castle and Tron.


  9. CarlySX is online now themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,322
    A look at the enormous Dragon Valley project currently under construction in Nanjing, China. The park will open with one of the new model Vekoma Shockwave coasters.






    Source: https://twitter.com/VHCoasters/status/1243633994048167937

  10. MouseEars is offline themeparX Top Investigator
    Join Date
    Mar 2020
    Posts
    68
    Parc Astérix completes its accommodation offer with a third hotel
    Welcome to the heart of the famous Lutèce! At the time, the city was organized around the Seine and had a vibrant commercial and cultural life. It is said that at nightfall, the quays filled up visibly and that laughter and the clanging of mugs were answered from one bank to the other. This is how the hotel Les Quais de Lutèce was designed, connecting the two banks of the Seine, as an authentic witness to the Roman art of living.

    This third hotel will also have 150 rooms and will complement the Parc Astérix hotel offer . It will also have its own seminar center, but also a swimming pool and a spa. The scenography signed Thierry Retif incorporates the codes of this ancient theme, transporting visitors in an authentic and friendly atmosphere.

    Able to accommodate up to 4 to 5 people, each room of around 30m² offers well-being and harmony of colors (sienna, brown, beige and sand). Comfortable and functional, with custom-designed furniture, these rooms are equipped with TV, free Wi-Fi, telephone, dressing room and air conditioning.

    The hotel also stands out for its production of hot water supported by 70 m² of solar panels installed on the roofs, but also by its wooden elements and facades from eco-responsible and sustainable French forests. The Park's commitment is also reflected in the collaboration with almost exclusively local subcontracting companies.








    Source: http://starparc.be/2019/02/le-parc-asterix-complete-son-offre-d-hebergements-avec-un-troisieme-hotel-l-hotel-des-trois-hiboux-au-coeur-de-la-foret-du-parc-aste

Page 11 of 62 ... 7 8 9 10 11 12 13 14 15 ...

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts