Send your construction pics to content_at_themeparxdotcom

Motiongate Dubai
Views: 1,249,467

Post an Update
Page 34 of 51 First Page ... 30 31 32 33 34 35 36 37 38 ... Last Page
Posts 331 - 340 of 502
Local Name:
موشنجيت دبي
Former Name(s):
Dubai Adventure Studios
Budget:
$750M
Announced:
07 Sep 2014
Construction Start:
Apr 2014
Opening:
18 Dec 2016
Location:
Area:
37 ha
Developer:
  1. That is incorrect....Their twitter account states this: DXB Parks & Resorts ‏@dxbparksresorts Oct 12

    "5 #rollercoasters at #motiongateDubai with a total length track of 2,593m – that’s enough to run the entire length of the Burj Khalifa x3"

    The sum of all the roller coaster in the park would have a length of 2539m not that coaster.

  2. Bevy is offline themeparX Top Investigator
    Join Date
    Feb 2015
    Posts
    235
    "Paragon Creative Wins £5m Theming Contract for DreamWorks Zone at Motiongate™, Dubai Parks and Resorts"

    The Design and Theming team at Paragon will be working on five show set areas – including Kung Fu Panda and Madagascar – on the £5 million project for the Motiongate™ theme park, set to open in 2016.
    Source: Blooloop

  3. We got the Motiongate Dubai press release trailer from their YouTube channel:



    https://www.youtube.com/watch?v=avddIuox0PA

  4. Bevy is offline themeparX Top Investigator
    Join Date
    Feb 2015
    Posts
    235
    Summary of Motiongate attractions:

    DreamWorks Animation, Sony Pictures and Lionsgate will have licensed rides in the park with films like The Hunger Games, Ghostbusters, Hotel Transylvania, The Smurfs, Zombieland, Shrek and more, see the list on the screen capture below. Attractions will include rollercoasters, multimedia theatre and a massive water ride which will use 793,000 gallons of water.
    Source:
    http://disneyandmore.blogspot.fr/2015/09/details-about-dubai-motiongate-theme.html

  5. Bevy is offline themeparX Top Investigator
    Join Date
    Feb 2015
    Posts
    235
    Interesting screenshots of Motiongate Dubai from the video shared below:









  6. Motiongate:


    Zones:

    Sony Pictures Studios:


    Smurfs Village:


    DreamWorks:


    Studio Central:


    Source:
    http://motiongatedubai.com/zones/





  7. Details on The Hotel Transylvania ride:
    The Hotel Transylvania ride will be in a 2,800 square metre indoor space and will be seven minutes long. During it you’ll be seated in a carriage that holds four people. The ride is ‘trackless’, and there are 27 separate carriages going around at once, which means you’ll never know which way you’ll turn and you’re likely to have near-misses with other punters. The highest point of the ride is 42 metres (about the same height as the Statue of Liberty). The ‘story’ of the ride will be a surprise party hosted by the monsters in the movie.


    Website: http://whatson.ae/dubai/knowledge/32145/giant-movie-theme-park-motiongate-dubai/

  8. Website is up : http://motiongatedubai.com

    Lots of information available.

  9. Bevy is offline themeparX Top Investigator
    Join Date
    Feb 2015
    Posts
    235
    Construction update: Rides engineering and manufacturing is 52% complete.



    Source:
    https://twitter.com/dxbparksresorts

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts