Send your construction pics to content_at_themeparxdotcom

Legoland Shenzhen
Views: 103,094

Post an Update
Page 7 of 7 First Page ... 3 4 5 6 7
Posts 61 - 65 of 65
Local Name:
深圳乐高乐园
Budget:
$1B
Announced:
31 Jan 2018
Construction Start:
26 Aug 2021
Opening:
2026
Area:
58 ha
  1. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    7,229
    Quote Originally Posted by Michael View Post
    The gate on the top right is more mysterious - at least one of the roller coasters shown in the layout looks quite large and no theme is indicated. Perhaps the entire layout of the top right gate is placeholder.
    As a follow-up to this, the third gate's name is "Lego Discovery Park", not to be confused with Legoland Discovery Center. The name itself could be a placeholder as well.

    The size of each of the three parks are Legoland - 262,700 square meters, Legoland Water Park - 96,500 square meters, and Lego Discovery Park - 103,000 square meters.

    Source: http://www.dpxq.gov.cn/gkmlpt/content/8/8534/post_8534632.html

  2. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    7,229
    Yesterday, February 24, the government in Shenzhen released the masterplan for Legoland Shenzhen and the surrounding area. As you can see in the masterplan, there is three gates plus a retail, dining, and entertainment area in the middle. The gate on the left (also the largest) is Legoland Shenzhen. Certain themed areas of the park can already be identified including Lego Castle, Miniland, and Lego City. The gate on the bottom right is clearly Legoland Water Park. The gate on the top right is more mysterious - at least one of the roller coasters shown in the layout looks quite large and no theme is indicated. Perhaps the entire layout of the top right gate is placeholder.



    For comparison, here's the masterplan for Legoland Sichuan:



    Sources: https://mp.weixin.qq.com/s/zlm751rsnPaBeTTtFVJ8-w and https://m.mp.oeeee.com/a/BAAFRD000020210224443462.html and https://www.sohu.com/a/452407969_161795

  3. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    7,229
    Latest satellite imagery:


  4. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    7,229

  5. admin is online now Administrator
    Join Date
    May 2011
    Posts
    206

    Legoland Shenzhen

    Status: Announced

Page 7 of 7 First Page ... 3 4 5 6 7

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts

themeparX and resortX are neutral, user-powered, and staff-moderated platforms that provide both aggregated and original news updates on theme park and resort projects worldwide. We are not affiliated with the owners or developers of the projects listed and receive no compensation from them.