Send your construction pics to uploads @ themeparx.com

Legoland Korea
Views: 173,012

Reply to Thread
Page 1 of 13 Previous FirstFirst 1 2 3 4 5 ... LastLast
Posts 1 - 10 of 127
Local Name:
춘천 레고랜드
Budget:
255M
Announced:
01 Sep 2011
Construction Start:
28 Nov 2014
Opening:
2022
Area:
28 ha
  1. Michael is online now themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    2,689

  2. Michael is online now themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    2,689
    Theme park is 67% complete and infrastructure is 25% complete.





    Small but new renderings:



    Sources: https://www.ytn.co.kr/_ln/0115_202101030406119212 and http://kwnews.co.kr/nview.asp?s=501&aid=221010300002

  3. Michael is online now themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    2,689

  4. Michael is online now themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    2,689

  5. Michael is online now themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    2,689

  6. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,390
    Thank you for the translation - it's interesting to understand what the local people think of it given that it has obviously been controversial.

    Quote Originally Posted by Guest View Post
    Translation:

    "Legoland, the children's theme park being built on Lake Uiam of Chuncheon, Gangwon-do has postponed their opening by a year due to COVID-19.

    The Government of Gangwon-do held a conference yesterday morning (18th), announced the safety inspectors were temporarily unable to enter the country and the inauguration of the park was pushed from the anticipated July 2021 to early 2022.

    It was confirmed as a requirement for an exclusive inspection team to reside at the construction site of Legoland, a theme park based off of the children's toy Lego, by nine months before the opening.

    The Legoland theme park which is to be hosted by Jung-do, Lake Uiam's inner island of Gangwon-do is said to have its first phase cost around 300 Bil. KRW won (276.8 Mil. USD dollars), and with the exception of the hotel is said to have 50% of the theme park and the infrastructure's construction complete."

    - -

    For your information, the comments on this video seems to be heavily panning the construction of this park in general. They seem to be complaining that the park trespasses many prehistoric artifacts and that a massive excavation should be in its place instead.

  7. Michael is online now themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    2,689
    Today, December 6 at 8:32am, a fire broke out at one of the back of house buildings at Legoland Korea. After an hour and twenty minutes the fire was fully extinguished. Workers inside the building were able to evacuate the area and no injuries have been reported. The fire's cause has yet to be determined.





















    Sources: https://www.yna.co.kr/view/IPT20201206000004365?section=gallery/index and https://www.yna.co.kr/view/AKR20201206009251062 and http://www.seoul.co.kr/news/newsView.php?id=20201206500027

  8. Translation:

    "Legoland, the children's theme park being built on Lake Uiam of Chuncheon, Gangwon-do has postponed their opening by a year due to COVID-19.

    The Government of Gangwon-do held a conference yesterday morning (18th), announced the safety inspectors were temporarily unable to enter the country and the inauguration of the park was pushed from the anticipated July 2021 to early 2022.

    It was confirmed as a requirement for an exclusive inspection team to reside at the construction site of Legoland, a theme park based off of the children's toy Lego, by nine months before the opening.

    The Legoland theme park which is to be hosted by Jung-do, Lake Uiam's inner island of Gangwon-do is said to have its first phase cost around 300 Bil. KRW won (276.8 Mil. USD dollars), and with the exception of the hotel is said to have 50% of the theme park and the infrastructure's construction complete."

    - -

    For your information, the comments on this video seems to be heavily panning the construction of this park in general. They seem to be complaining that the park trespasses many prehistoric artifacts and that a massive excavation should be in its place instead.

    Quote Originally Posted by CarlySX View Post
    This report says there is a delayed safety inspection which contributed to the hold up to 2022 opening. Can anyone translate and give better information?






  9. The safety diagnosis team cannot enter Korea due to COVID-19.

    Therefore, the opening plan has delayed from July 2020 to the first half of 2021.

    The process rate of rides and major facilities is about 50% excluding the hotels.

  10. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,390
    This report says there is a delayed safety inspection which contributed to the hold up to 2022 opening. Can anyone translate and give better information?






Page 1 of 13 Previous FirstFirst 1 2 3 4 5 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts