Send your construction pics to uploads @ themeparx.com

Legoland Dubai
Views: 132,969

Reply to Thread
Page 5 of 8 1 2 3 4 5 6 7 8
Posts 41 - 50 of 73
  1. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,286
    Potential soft opening date of September 1st, 2016.

    We start to turn over pieces of the park next January - February timeframe and there's a sequence of handover through 2016 culminating in a soft opening on September 1, 2016.

    Source: http://www.arabianbusiness.com/dubai-theme-park-resort-eyes-soft-opening-on-sept-1-2016-616202.html

  2. UAEwatch is offline Park Investigator
    Join Date
    Dec 2015
    Posts
    6
    New satellite footage:



    More in the Dubai Parks & Resorts section:
    http://www.themeparx.com/dubai-parks-and-resorts/

    Retrieved from Google Maps on 12/30/2015:
    http://maps.google.com

  3. Earthling is offline Senior Park Investigator
    Join Date
    Oct 2015
    Posts
    11
    Legoland Dubai as of 7 March 2015:



    Source: Google Earth and DigitalGlobe
    http://www.google.com/earth/

  4. Bevy is offline Senior Park Investigator
    Join Date
    Feb 2015
    Posts
    231

    "The Dragon" stands at 16 meters and will reach speeds of 60kph. This will become the centerpiece of LEGO Kingdom.

    Source:
    http://www.timeoutdubai.com/knowledge/news/66762-dubai-parks-and-resorts-first-rollercoaster-completed




  5. Bevy is offline Senior Park Investigator
    Join Date
    Feb 2015
    Posts
    231
    "AE Arma-Elektropanç has secured the contract to carry out MEP works at Legoland Dubai."

    Under the terms of the deal, the Turkish firm will oversee aspects including heating, ventilation and air conditioning (HVAC), low voltage (LV) electrical distribution, the installation of fire alarms, domestic and chilled water supply, drainage and sanitation, compressed air systems, and much of the onsite technology.
    Source:
    http://www.constructionweekonline.com/article-34072-ae-arma-elektropanc-wins-legoland-dubai-mep-work/

  6. Bevy is offline Senior Park Investigator
    Join Date
    Feb 2015
    Posts
    231

  7. Bevy is offline Senior Park Investigator
    Join Date
    Feb 2015
    Posts
    231


    The layout of LEGOLAND® Dubai, part of Dubai Parks and Resorts, was unveiled to thousands of local and international visitors attending ATM 2015 with a unique four metre squared, LEGO®-built model map.
    Read more:
    http://www.eyeofriyadh.com/news/details/brick-by-brick-atm-brings-legoland-dubai-to-life

Page 5 of 8 1 2 3 4 5 6 7 8

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts