Send your construction pics to content_at_themeparxdotcom

HotGo DreamWorld
Views: 154,782

Post an Update
Page 6 of 6 First Page ... 2 3 4 5 6
Posts 51 - 57 of 57
  1. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    422


    Source:
    Blooloop

  2. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    422


    A recent ban on new theme parks projects in China has not stopped any of the ongoing projects I know of.
    ?!

    Source:
    http://inparkmagazine.blogspot.com/2012/05/demand-in-design-darrias-baker-talks-to.html

  3. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    422
    Goddard Group is in charge of the design. Layouts and artwork here:
    http://www.garygoddard.com/architectural-design/fushun-dreamworld/

  4. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    422
    From the same article:

    The amusement park in Fushun — called Fushun Dream World — is being financed by Duan Xing, owner of one of the largest road and highway construction companies in China. The 200-acre park is to be 200 acres in size — larger than Disneyland in Anaheim — and will include an array of features, including a high-rise hotel, high-end shopping area called Diamond Promenade, an indoor water park, a family entertainment center and five theme-specific areas, ala Disneyland.

  5. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    422
    Soon after landing the landscaping contract for a multi-million dollar Disney-quality amusement park in Fushun, China, David McCullough discovered two startling things about big business in China: money is no obstacle and speed is essential.

    “Cost was never an issue,” says McCullough. “In fact, at one of our first meetings, we brought up cost and we were immediately asked to never do so again, as long as what we proposed was to Disney standards or better. This was our first preview to the fact that in China, things are done much different than in the United States.”

    McCullough and his design team also were surprised by the quickness by which the Chinese implemented its designs. “As soon as we delivered drawings, they began construction,” says McCullough. “We sent them site design development grading and drainage design intent drawings one week and were informed next that they had begun grading the site and pouring foundations.”
    Source:
    http://sdnorthparknews.com/2010/12/dream-job-with-dream-world-in-fushun-china/

  6. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    422

  7. admin is offline Administrator
    Join Date
    May 2011
    Posts
    184

    HotGo DreamWorld

    Status: under construction

Page 6 of 6 First Page ... 2 3 4 5 6

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts