Send your construction pics to uploads @ themeparx.com

HotGo DreamWorld
Views: 77,731

Reply to Thread
Page 5 of 5 FirstFirst 1 2 3 4 5 LastLast Next
Posts 41 - 50 of 50
Local Name:
热高乐园
Budget:
1.5B
Announced:
Construction Start:
Opening:
on hold
Location:
Area:
81 ha
  1. LI
    LI is offline Curious Chap
    Join Date
    Aug 2013
    Posts
    7
    From LinkedIn sources:

    Kirk is currently the Architectural Project Designer for Dreamworld Resort and Theme Park, a $1.5 billion dollar resort development in Shenyang/Fushun Peoples Republic of China. While at Dreamworld he has been developing concept designs for a 400 room hotel and a 600 room hotel and spa which includes exclusive high end commercial and mixed use retail, residential with an entertainment zone.

  2. When will it open?

  3. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    420

  4. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    420

  5. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    420


    A recent ban on new theme parks projects in China has not stopped any of the ongoing projects I know of.
    ?!

    Source:
    http://inparkmagazine.blogspot.com/2012/05/demand-in-design-darrias-baker-talks-to.html

  6. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    420
    Goddard Group is in charge of the design. Layouts and artwork here:
    http://www.garygoddard.com/architectural-design/fushun-dreamworld/

  7. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    420
    From the same article:

    The amusement park in Fushun — called Fushun Dream World — is being financed by Duan Xing, owner of one of the largest road and highway construction companies in China. The 200-acre park is to be 200 acres in size — larger than Disneyland in Anaheim — and will include an array of features, including a high-rise hotel, high-end shopping area called Diamond Promenade, an indoor water park, a family entertainment center and five theme-specific areas, ala Disneyland.

  8. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    420
    Soon after landing the landscaping contract for a multi-million dollar Disney-quality amusement park in Fushun, China, David McCullough discovered two startling things about big business in China: money is no obstacle and speed is essential.

    “Cost was never an issue,” says McCullough. “In fact, at one of our first meetings, we brought up cost and we were immediately asked to never do so again, as long as what we proposed was to Disney standards or better. This was our first preview to the fact that in China, things are done much different than in the United States.”

    McCullough and his design team also were surprised by the quickness by which the Chinese implemented its designs. “As soon as we delivered drawings, they began construction,” says McCullough. “We sent them site design development grading and drainage design intent drawings one week and were informed next that they had begun grading the site and pouring foundations.”
    Source:
    http://sdnorthparknews.com/2010/12/dream-job-with-dream-world-in-fushun-china/

  9. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    420

  10. admin is online now Administrator
    Join Date
    May 2011
    Posts
    159

    HotGo DreamWorld

    Status: under construction

Page 5 of 5 FirstFirst 1 2 3 4 5 LastLast Next

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts