Send your construction pics to content_at_themeparxdotcom

Hossoland
Views: 127,852

Post an Update
Page 2 of 14 First Page 1 2 3 4 5 6 ... Last Page
Posts 11 - 20 of 133
Local Name:
Hossoland
Budget:
Announced:
07 Sep 2022
Construction Start:
07 Sep 2022
Opening:
31 May 2025
Area:
40 ha
Developer:
Hosso Group
Operator:
Hosso Group
Contractors:
Other Suppliers:

  1. Kivora92 is offline themeparX Top Investigator
    Join Date
    Jul 2017
    Posts
    76

  2. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    7,136

  3. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    7,136

  4. Kivora92 is offline themeparX Top Investigator
    Join Date
    Jul 2017
    Posts
    76

  5. Kivora92 is offline themeparX Top Investigator
    Join Date
    Jul 2017
    Posts
    76

  6. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    7,136
    The construction of Hossoland is gaining momentum. We have started the assembly of the first roller coaster, which will soon provide an unforgettable experience to our guests. We invite you to view the latest photos straight from the construction site.

















    Sources: https://hossoland.pl/montaz-pierwszego-rollercoastera-w-hossolandzie-rozpoczety/ and https://www.facebook.com/Hossoland/posts/pfbid025YBKq4EMLKfWybWEvzhqexv69bwj2VStSDGxAEQxD8x5bvhmGy1AKCQir8s47oDhl and https://www.facebook.com/Hossoland/posts/pfbid0A5GSUWHbD4LJcwS5ue1wYYth7xaeuLFCcnWvFWDxivy6zSLH3qEdteNKfoRrWVAFl

  7. MichMile3 is offline Curious Chap
    Join Date
    Mar 2025
    Posts
    2
    Quote Originally Posted by Guest View Post
    The colours are the same of the ghostrider but I fear this could be a family invert for that large brown support. But looking at the size of the track compared to the blue one, It's seems like something huge. Also the new footers shown don't match with the ghostrider layout. This park is a total mystery.
    Probably nothing spectacular at opening. Soruce: https://parkmag.pl/nowe-wiesci-z-hossolandu-mamy-nieoficjalne-doniesienia-o-atrakcjach/

    "Unconfirmed reports from observers that we have reached further suggest that the roller coasters supplied to Hossoland by Vekoma will most likely include the Junior Coaster (247 m and 335 m) as well as the Suspended Family Coaster (453 m).

    Earlier, there were also speculations about the GhostRider model, the first one of which Vekoma was supposed to build for Hossoland. However, we did not receive such confirmation. It is known, however, that GhostRider is to be built in Cacau Park - an amusement park that is being built in Brazil (and whose main theme will be chocolate and cocoa). Is Vekoma building two rollercoasters of this type? It is not known yet.

    Representatives of the Hosso Group in a conversation with Parkmag do not yet want to confirm or deny the speculations that appear in discussions about Hossoland and leaks from the construction."




  8. The colours are the same of the ghostrider but I fear this could be a family invert for that large brown support. But looking at the size of the track compared to the blue one, It's seems like something huge. Also the new footers shown don't match with the ghostrider layout. This park is a total mystery.

Page 2 of 14 First Page 1 2 3 4 5 6 ... Last Page

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts