Send your construction pics to content_at_themeparxdotcom

Hossoland
Views: 95,262

Post an Update
Page 2 of 11 First Page 1 2 3 4 5 6 ... Last Page
Posts 11 - 20 of 103
Local Name:
Hossoland
Budget:
Announced:
07 Sep 2022
Construction Start:
07 Sep 2022
Opening:
31 May 2025
Area:
40 ha
Developer:
Hosso Group
Operator:
Hosso Group
Contractors:
Other Suppliers:
  1. Kivora92 is offline themeparX Top Investigator
    Join Date
    Jul 2017
    Posts
    65

  2. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,965





  3. I agree with what you've just said there. It look like an amazing project with a really detailed theme but WHERE ARE THE RIDES, COASTERS, AND RAPIDS?!

    I've been following along for more than a year now waiting for the rides to start being installed but NOTHING...

  4. This is a very curious construction project - progress seems slow but steady but it always fascinates me how the construction site always appears to be deserted.

    It doesn't appear there have been many changes since the original concept images were released, but are all the rides and attractions still planned? I'm surprised we're not seeing any work on those, such as foundations for coasters or concrete pours for the rapids.

    Apologies if I've missed any posts on this, I've skimmed through the thread and couldn't see anything.

  5. Kivora92 is offline themeparX Top Investigator
    Join Date
    Jul 2017
    Posts
    65

  6. Kivora92 is offline themeparX Top Investigator
    Join Date
    Jul 2017
    Posts
    65

  7. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,965





  8. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,965




    Paraphrased translation to English:

    Currently, the Hossoland amusement park is underway, among others, craft work on the main sculptures depicting figures and elements that will create the style of individual thematic zones.

    In addition, the decorative facades and roofs of the buildings in which the dining points and souvenir shops will be located have already been completed.

    In addition, a significant part of the paving work is entering an advanced stage and will be at the final stage in the coming weeks.

    Advanced works related to aesthetics allow you to feel the atmosphere and guiding style of the park.
    Source: https://hossoland.pl/w-hossoland-trwaja-zaawansowane-prace-w-zakresie-elementow-dekoracyjnych/

  9. Kivora92 is offline themeparX Top Investigator
    Join Date
    Jul 2017
    Posts
    65

  10. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,965

Page 2 of 11 First Page 1 2 3 4 5 6 ... Last Page

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts