Local Name:
香港迪士尼樂園擴張
Budget:
1.4B
Announced:
30 Jun 2009
Construction Start:
13 Dec 2009
Opening:
2023
Location:
Area:
5 ha
Developer:
Hong Kong International Theme Parks, Walt Disney Parks & Resorts
Operator:
Hong Kong International Theme Parks, Walt Disney Parks & Resorts
Consultants:
  1. Michael is online now themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    4,442



  2. Sunmz is offline themeparX Top Investigator
    Join Date
    Jun 2019
    Posts
    133

  3. rlcoolastic is offline themeparX Top Investigator
    Join Date
    Jul 2008
    Posts
    133
    Construction Update (Mid-June, 2021): "Arendelle: World of Frozen"

    More steel frames have been constructed on the structures of North Mountain and the surrounding areas.















    Source: Disney Magical Kingdom Blog | https://twitter.com/DMK_Blog/status/1406475153979047936?s=20 & https://twitter.com/DMK_Blog/status/1406474926190563330?s=20

  4. rlcoolastic is offline themeparX Top Investigator
    Join Date
    Jul 2008
    Posts
    133
    "Arendelle: World of Frozen" Construction Update | (June 19, 2021)



    Source: Disney Magical Kingdom Blog

  5. rlcoolastic is offline themeparX Top Investigator
    Join Date
    Jul 2008
    Posts
    133
    Two minor observations about “Arendelle: World of Frozen”:

    Window frames can be seen on the facade of “Tick Tock Toys and Collectibles”. The design of village houses continues to be identical to the leaked blueprint of Paris’ clone version.





    Rockwork steel frame installation has begun for “Wandering Oaken’s Sliding Sleigh”, part of the steel frame began to surround the roller coaster track (covered with green canvas).





    Rooftops of “Tick Tock Toys and Collectibles” have been installed, window frames on the facade are also being installed.







    Protection layers for the rooftops of “Tick Tock Toys and Collectibles” have been removed, the entire rooftop can now be seen. Also, more window frames and theming details have been added to the facade.








    Source: HKDL Fantasy | https://twitter.com/hkdlfantasy/status/1401489259974987777?s=20, https://twitter.com/hkdlfantasy/status/1401489702302064644?s=20, https://twitter.com/hkdlfantasy/status/1402510555634495496?s=20, https://twitter.com/hkdlfantasy/status/1403731638589169665?s=20

  6. Facade Engineering for Arendelle: World of Frozen



    https://www.bbim.com.hk/bim-modelling

  7. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,459

  8. rlcoolastic is offline themeparX Top Investigator
    Join Date
    Jul 2008
    Posts
    133
    "Arendelle: World of Frozen" Construction Update | (Early-June, 2021)



    Source: Disney Magical Kingdom Blog

  9. Supersnow845 is offline Park Investigator
    Join Date
    Nov 2020
    Posts
    7
    Scaffolding for the mountain backdrop of Arendelle is now tall enough to be seen from most corners of the park







    https://www.facebook.com/hkmsg/posts/4577780512235566

  10. Supersnow845 is offline Park Investigator
    Join Date
    Nov 2020
    Posts
    7
    From Hong Kong Main Street Gazette new images released showing planned projection mapping of the new “Cherish the Memories” show rumoured to be arriving this summer















    https://www.facebook.com/hkmsg/posts/4503888776291407