Send your construction pics to content_at_themeparxdotcom

Reply to Thread
Page 5 of 16 FirstFirst 1 2 3 4 5 6 7 8 9 ... LastLast
Posts 41 - 50 of 159
Local Name:
杭州湾融创文旅城
Former Name(s):
Zhejiang Riverside Themed Town (Six Flags Haiyan)
Budget:
1.4B
Announced:
28 Sep 2015
Construction Start:
04 Jan 2016
Opening:
2025
Location:
Area:
291 ha
  1. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,861

  2. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,861
    ORIA, an architecture company based in Shanghai, has been commissioned to design the main entrance and exterior of the flying theater ride for Hangzhou Bay Sunac Cultural Tourism City's theme park, which of course was originally going to be Six Flags. The flying theater was not planned for Six Flags but has since been added to the design. The theme is now science fiction/futuristic.

    Entrance area:









    Flying theater:





    Source: https://mp.weixin.qq.com/s/2oggE6OlehIoO5LB_IqWsw

  3. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,861
    The waterpark is progressing nicely ahead of its opening next year:









    Next door at the theme park footers are going in for the Mack mega coaster at the entrance:





    Source: https://v.douyin.com/JX3R2rk/

  4. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,861
    Interestingly it seems some work is taking place on both sides of what was going to be Thrillseeker Plaza:













    Sources: https://v.douyin.com/JCsjWmr/ and https://v.douyin.com/JCsDT1T/

  5. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,861
    View of the waterpark from the hotel:



    Source: https://v.douyin.com/JuT8uvP/

  6. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,861

  7. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,861

  8. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,861

  9. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,861
    It's a busy time right now at the waterpark - lots of landscaping is going in, supports for the water coaster are being installed, and waterslides continue to test!





























    Meanwhile at the adjacent theme park not much is happening yet but hopefully that will change next year...







    Sources: https://v.douyin.com/JD67qbE/ and https://v.douyin.com/JDKnrXo/ and https://v.douyin.com/JUAvFgF/ and https://v.douyin.com/JU5a8c8/ and https://v.douyin.com/JyBhnU1/ and https://v.douyin.com/JyBQBEK/ and https://v.douyin.com/JyBubJh/ and https://v.douyin.com/Jyuoexf/

  10. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    3,861

Page 5 of 16 FirstFirst 1 2 3 4 5 6 7 8 9 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts