Send your construction pics to content_at_themeparxdotcom

Post an Update
Page 3 of 152 First Page 1 2 3 4 5 6 7 ... Last Page
Posts 21 - 30 of 1514
  1. Quote Originally Posted by Guest View Post
    Looking at the website https://infinityassets.com/ that I found when I was looking at the box labels showed that the auction is mainly the assets of Dynamic Attractions. So either these parts are for a different project or these are the unfinished parts for SFX coaster at Genting SkyWorlds.
    According to a Twitter user who has bought some SFX Coaster wheels belonging to dynamic attractions, it is true that all the assets are for the project at Genting Skyworld based on the project code number.
    https://twitter.com/parkineer/status/1679560007874912267?t=ylOU4mEFpvPi3lfN5Fd06g&s=19

  2. Quote Originally Posted by Bacon View Post
    I’m so confused about the Genting SFX Coster, what actually happened? Does Genting no longer want to build it? What does Genting have planned for this ride?
    Looking at the website https://infinityassets.com/ that I found when I was looking at the box labels showed that the auction is mainly the assets of Dynamic Attractions. So either these parts are for a different project or these are the unfinished parts for SFX coaster at Genting SkyWorlds.

  3. Bacon is offline New User
    Join Date
    Jul 2023
    Posts
    1
    Quote Originally Posted by Guest View Post
    Roller coaster parts, steel pipe, scrap steel, etc is believed to belong to the SFX Coaster for Genting SkyWorlds and there is also a code number and Dynamic company name on the box. Now it is sold.











    I’m so confused about the Genting SFX Coster, what actually happened? Does Genting no longer want to build it? What does Genting have planned for this ride?

  4. Roller coaster parts, steel pipe, scrap steel, etc is believed to belong to the SFX Coaster for Genting SkyWorlds and there is also a code number and Dynamic company name on the box. Now it is sold.












  5. TheneParkGuy is offline themeparX Top Investigator
    Join Date
    Jan 2019
    Posts
    76
    New props have been added to Mad Ramp Peak - Full Throttle Racing's picture spot:



    Source: https://twitter.com/esainton/status/1668492097975103488

  6. During my visit, the sfx track of the coaster looked increasingly dirty and rusty. If Dynamics Attraction still hasn't put an end to their problems, this construction will be delayed further until the attraction seems unawakened.

  7. New additions to the props for the Mad Ramp Peak attraction - maybe this is a sign it will open soon.



    https://instagram.com/stories/arifzef/3108139998296641818

  8. Rumor has it that the Mad Ramp Peak rollercoaster will open this June according to park people.

  9. Looking at this video, there are still a lot of SFX Coaster tracks that haven't been installed yet.

  10. Quote Originally Posted by Guest View Post
    I think we won’t expect the dark coaster until 2026
    As noted below Dynamic Attractions has gone into some sort of financial re-structuring, so the SFX coaster won’t be ready to open so soon. But I’m hopeful it will open sometime, Genting has spent too much money on it to not let it open.

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts