  1. Quote Originally Posted by Guest View Post
    Incorrect. Vehicle design/engineering is different.
    He means the Tilt and Drop and Side Slide parts as an example picture later it will still be the same as in Genting later

  2. Incorrect. Vehicle design/engineering is different.

  3. Some pictures of the SFX coaster part, although the design of the vehicle from Mission Ferrari remains the same as the sfx coaster in Genting: https://forum.lowyat.net/index.php?showtopic=4813577&view=findpost&p=103619322

  4. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,682


  5. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,682

  6. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,682
    Quote Originally Posted by Guest View Post
    This project is completed. It is open and no longer under construction so it should be moved to the completed section.
    1. The park has yet to have a grand opening
    2. Multiple major rides have yet to even soft open
    3. Track is still being installed on the park's SFX coaster

  7. This project is completed. It is open and no longer under construction so it should be moved to the completed section.

  8. Quote Originally Posted by Guest View Post
    Shouldn’t this be moved to completed?
    What do you mean?

  9. Shouldn’t this be moved to completed?