Send your construction pics to uploads @ themeparx.com

Reply to Thread
Page 34 of 54 ... 30 31 32 33 34 35 36 37 38 ...
Posts 331 - 340 of 531
Local Name:
دبي باركس آند ريزورتس
Budget:
2.7B
Announced:
07 Sep 2014
Construction Start:
Apr 2014
Opening:
18 Dec 2016
Location:
Area:
232 ha
  1. alien_1020 is offline Senior Park Investigator
    Join Date
    Sep 2013
    Posts
    13
    Is it possible for all three parks to open on October 2016?

  2. That picture posted on the 16th is from New Jersey.

  3. I thought there was supposed to be 16 rides and attractions. See here: http://www.tradearabia.com/news/TTN_268090.html

    Based on the Attractions tab I counted the following:

    Ride/Attraction (5): Don 3D ride, Lagaan (maybe?), Sholay shooter game, You be the Star, and simulated flight.

    If we add the shows including what reads as "streetmosphere":
    Shows (8): Magik, Train Dance, stunt show, Folk/Regional Dance Show, theatre live shows during the day, theatre live shows during the night, multi sensory theatre attraction, and live dances.

    ... a grand total of 13 things to see/do and no coaster.

    Ticket price for this park better be LOW because it's already reading like a disappointing experience.

  4. Screenshots from the link in the last post. Good to see the October 2016 opening announcement.





  5. Bollywood Park website:http://bollywoodparksdubai.com/

  6. I seriously doubt it. That looks very old school

  7. Bevy is offline Senior Park Investigator
    Join Date
    Feb 2015
    Posts
    231
    That is incorrect....Their twitter account states this: DXB Parks & Resorts ‏@dxbparksresorts Oct 12

    "5 #rollercoasters at #motiongateDubai with a total length track of 2,593m – that’s enough to run the entire length of the Burj Khalifa x3"

    The sum of all the roller coaster in the park would have a length of 2539m not that coaster.
    Thanks for the correction!

  8. Earthling is offline Senior Park Investigator
    Join Date
    Oct 2015
    Posts
    11
    Dubai Parks & Resorts (DPR) as of 7 March 2015...

    Bollywood:


    Legoland:


    Motiongate:


    Source: Google Earth and DigitalGlobe
    http://www.google.com/earth/

  9. That is incorrect....Their twitter account states this: DXB Parks & Resorts ‏@dxbparksresorts Oct 12

    "5 #rollercoasters at #motiongateDubai with a total length track of 2,593m – that’s enough to run the entire length of the Burj Khalifa x3"

    The sum of all the roller coaster in the park would have a length of 2539m not that coaster.

  10. Bevy is offline Senior Park Investigator
    Join Date
    Feb 2015
    Posts
    231
    "Paragon Creative Wins £5m Theming Contract for DreamWorks Zone at Motiongate™, Dubai Parks and Resorts"

    The Design and Theming team at Paragon will be working on five show set areas – including Kung Fu Panda and Madagascar – on the £5 million project for the Motiongate™ theme park, set to open in 2016.
    Source:
    http://www.blooloop.com/news/paragon-creative-dreamworks-motiongate-dubai-parks/36491#.VhaHGvmqqko

Page 34 of 54 ... 30 31 32 33 34 35 36 37 38 ...

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts