Send your construction pics to content_at_themeparxdotcom

Post an Update
Page 49 of 68 First Page ... 45 46 47 48 49 50 51 52 53 ... Last Page
Posts 481 - 490 of 680
Local Name:
دبي باركس آند ريزورتس
Budget:
$2.7B
Announced:
07 Sep 2014
Construction Start:
Apr 2014
Opening:
18 Dec 2016
Location:
Area:
232 ha
Developer:
  1. That picture posted on the 16th is from New Jersey.

  2. I thought there was supposed to be 16 rides and attractions. See here: http://www.tradearabia.com/news/TTN_268090.html

    Based on the Attractions tab I counted the following:

    Ride/Attraction (5): Don 3D ride, Lagaan (maybe?), Sholay shooter game, You be the Star, and simulated flight.

    If we add the shows including what reads as "streetmosphere":
    Shows (8): Magik, Train Dance, stunt show, Folk/Regional Dance Show, theatre live shows during the day, theatre live shows during the night, multi sensory theatre attraction, and live dances.

    ... a grand total of 13 things to see/do and no coaster.

    Ticket price for this park better be LOW because it's already reading like a disappointing experience.

  3. Screenshots from the link in the last post. Good to see the October 2016 opening announcement.





  4. Bollywood Park website:http://bollywoodparksdubai.com/

  5. I seriously doubt it. That looks very old school

  6. Bevy is offline Senior Park Investigator
    Join Date
    Feb 2015
    Posts
    231
    That is incorrect....Their twitter account states this: DXB Parks & Resorts ‏@dxbparksresorts Oct 12

    "5 #rollercoasters at #motiongateDubai with a total length track of 2,593m – that’s enough to run the entire length of the Burj Khalifa x3"

    The sum of all the roller coaster in the park would have a length of 2539m not that coaster.
    Thanks for the correction!

  7. Earthling is offline Senior Park Investigator
    Join Date
    Oct 2015
    Posts
    11
    Dubai Parks & Resorts (DPR) as of 7 March 2015...

    Bollywood:


    Legoland:


    Motiongate:


    Source: Google Earth and DigitalGlobe
    http://www.google.com/earth/

  8. That is incorrect....Their twitter account states this: DXB Parks & Resorts ‏@dxbparksresorts Oct 12

    "5 #rollercoasters at #motiongateDubai with a total length track of 2,593m – that’s enough to run the entire length of the Burj Khalifa x3"

    The sum of all the roller coaster in the park would have a length of 2539m not that coaster.

  9. Bevy is offline Senior Park Investigator
    Join Date
    Feb 2015
    Posts
    231
    "Paragon Creative Wins £5m Theming Contract for DreamWorks Zone at Motiongate™, Dubai Parks and Resorts"

    The Design and Theming team at Paragon will be working on five show set areas – including Kung Fu Panda and Madagascar – on the £5 million project for the Motiongate™ theme park, set to open in 2016.
    Source: Blooloop

  10. We got the Motiongate Dubai press release trailer from their YouTube channel:



    https://www.youtube.com/watch?v=avddIuox0PA

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts