Send your construction pics to content_at_themeparxdotcom

Post an Update
Page 41 of 53 First Page ... 37 38 39 40 41 42 43 44 45 ... Last Page
Posts 401 - 410 of 526
  1. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,499


    The development permit for #WDS2 Lake has been granted!
    ➡️ Key points :
    1 Lake Surface = 2,87 ha
    2 Construction completed by 2022.
    3 Navigations with guests will take place on the lake.
    4 Shows related to the new lands will take place (night & day).
    5 Pyrotechnic type activities, animations, light shows and aquatic animations.
    6 The "Circle shaped" lake will have a surface of 1,67ha
    Source: https://twitter.com/DisneylandWorks/status/1191409062040285185

  2. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,499
    Breaking: Hotel New York: The Art of Marvel opens June 15, 2020.






    Source: https://twitter.com/ED92live/status/1189857429946806272

  3. Avengers Campus at Walt Disney Studios Park







    https://www.facebook.com/341629559771205/posts/437798106821016

  4. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    6,323
    New concept art of the upcoming Frozen-themed area at Walt Disney Studios Park



    This fully immersive land will feature an attraction, a restaurant and shops.
    Source: https://twitter.com/disneyparis_en/status/1171344077704634368

  5. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,499
    The new Walt Disney Studios Park Map, valid from Monday September 2nd, does not feature the Rock n’ Roller Coaster or Armageddon show buildings. Instead, a green Avengers logo marks the future location of Avengers Campus.

  6. Sunmz is offline themeparX Top Investigator
    Join Date
    Jun 2019
    Posts
    203
    Walls up around the entrance to the now closed Rock n’ Roller Coaster for its transformation to Iron Man-themed ride





    https://twitter.com/ed92live/status/1168426188483825665

  7. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,499
    Foundation works at the site of the Spider-Man Experience, part of the upcoming #AvengersCampus #WDS2


    Source: https://twitter.com/ED92live/status/1166255302175596544

  8. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,499


    Concept art of the exterior of the upcoming Spider-Man attraction (right) and the rest of the Marvel themed-land at Walt Disney Studios Paris.


    Source: https://wdwnt.com/2019/07/concept-art-ride-vehicle-revealed-for-disneys-spider-man-ride-at-disneyland-resort-disneyland-paris/

  9. Sunmz is offline themeparX Top Investigator
    Join Date
    Jun 2019
    Posts
    203
    A crane has gone up at Walt Disney Studios Park for the upcoming Marvel area





    https://www.facebook.com/OutsidEarsDLP/posts/409991382935022

  10. The map is about geothermal energy distribution. They found a geothermal source in Village Nature and want to use parts of it for electricity in DLP.

    That it shows part of the current masterplan is merely coincidental, but good for us.

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts