Send your construction pics to content_at_themeparxdotcom

Post an Update
Page 56 of 57 First Page ... 52 53 54 55 56 57 Last Page
Posts 551 - 560 of 565
  1. Tloz is offline themeparX Top Investigator
    Join Date
    Jul 2012
    Posts
    40
    If it's true it's going to be so amazing. French procedures makes it so slow and hard to got budget. If TWDC owns it, there will be no problems for funding

  2. If the rumours are true then I can't wait to see what's going to happen!

  3. Tloz is offline themeparX Top Investigator
    Join Date
    Jul 2012
    Posts
    40
    There's a growing rumour on line that says the WDC would buy all the parts of EuroDisney SCA, and get full responsability. This could mean huge changes in a near future. But it's just a rumour (for now...)

  4. Tloz is offline themeparX Top Investigator
    Join Date
    Jul 2012
    Posts
    40
    Quote Originally Posted by Unregistered View Post
    What do you mean with that?
    Curse you Google Translate! ^^

    I mean the flow should be the same (not sure to be clear)
    Let's give an example: around 2000 guest per hour can board Space Mountain. It will be the same for Ratatouille.

  5. and is supposed to have debit equivalent as Space Mountain
    What do you mean with that?

  6. Tloz is offline themeparX Top Investigator
    Join Date
    Jul 2012
    Posts
    40

    Personal Hypothesis: the grey and orange bars may be capacity captors, and the final floor may be as high as these bars.


    The grey stuff on the right might be the control rooms




    Photos from Disney Gazette

    The ride will have a single ride line, a Fastpass line, and is supposed to have debit equivalent as Space Mountain

  7. Tloz is offline themeparX Top Investigator
    Join Date
    Jul 2012
    Posts
    40
    This seems to be what will be hiding the Imagination building

    A new black structure has appeared:

    DisneyCentralPlaza

    Still in WDS, some people think that TSM might come, because of some clues left by P. Gas, EuroDisney SCA CEO. I'm sorry but I'm curently unable to find the interview.

  8. Tloz is offline themeparX Top Investigator
    Join Date
    Jul 2012
    Posts
    40

    Ratatouille dark ride construction

    -Green: intern waiting line
    -Black: fastpass and entry
    -Yellow: restaurant entry
    -White: fake building or shop
    -Red: restaurant room
    -Blue: restaurant facilities (toilets, kitchen, cold room, ...)
    -Brown: maybe a CM room, or restaurant exit

    Everything on the right: the ride itself


    Colors and separated parts from Bob, via Disneycentralplaza

  9. Tloz is offline themeparX Top Investigator
    Join Date
    Jul 2012
    Posts
    40
    New shot for the Ratatouille construction:


    From DLRP Express, vis DisneyCentralPlaza

  10. Tloz is offline themeparX Top Investigator
    Join Date
    Jul 2012
    Posts
    40
    I'm happy to be helpfull. I could be more precise, but my english isn't enough good for me to go technical

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts