  1. Screenshots from the link in the last post. Good to see the October 2016 opening announcement.





  2. Bollywood Park website:http://bollywoodparksdubai.com/

  3. Earthling is offline Senior Park Investigator
    Join Date
    Oct 2015
    Posts
    12
    Dubai Parks & Resorts (DPR) as of 7 March 2015...

    Bollywood:


    Legoland:


    Motiongate:


    Source: Google Earth and DigitalGlobe
    http://www.google.com/earth/

  4. News from their Twitter:

    "We are happy to announce that our resort-wide development is 43% complete"



    Link:
    https://twitter.com/dxbparksresorts


  5. Bevy is offline themeparX Top Investigator
    Join Date
    Feb 2015
    Posts
    235
    Steady construction progress has been reported at the project; 17% of work on the total development has been conducted, and engineering and manufacturing elements for the rides are 40% complete.

    Infrastructure work is 45% complete at Legoland, where piling activities are currently in progress. Moreover, rides for the theme park are ready to be shipped in from Europe.

    Things are also progressing steadily at Bollywood Parks, with 30% of the projects infrastructure now complete.
    Read more here:
    http://www.constructionweekonline.com/article-33934-roller-coaster-rise/3/

  6. From Dubai Parks and Resorts' Twitter page:
    https://twitter.com/dxbparksresorts



  7. Bevy is offline themeparX Top Investigator
    Join Date
    Feb 2015
    Posts
    235

  8. Bevy is offline themeparX Top Investigator
    Join Date
    Feb 2015
    Posts
    235


    The overall construction of the 25 million-square-foot park is about 17 per cent complete, including the underground and facilities work, the company said. Completion rates vary for individual segments, such as the engineering and rides works, which are 40 per cent finished....
    Source:
    http://www.thenational.ae/business/travel-tourism/legoland-and-bollywood-theme-parks-to-spark-new-developments-when-dubai-project-opens