Send your construction pics to uploads @ themeparx.com

Acqualinda
Views: 8,042

Reply to Thread
Page 1 of 3 Previous FirstFirst 1 2 3 LastLast
Posts 1 - 10 of 27
Local Name:
Acqualinda
Budget:
90M
Announced:
01 Nov 2018
Construction Start:
19 Feb 2019
Opening:
2021
Area:
9 ha
Developer:
Mário Celso Lopes
Operator:
Consultants:
Contractors:
Ride Suppliers:
Other Suppliers:

  1. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    2,804
    Work is expected to accelerate soon with the arrival of Aquakita employees onsite for slide installation.









































    Source: https://www.hojemais.com.br/andradina/noticia/seu-espaco-andradina/acqualinda-chega-na-fase-de-acabamento-e-tera-obras-24-horas-por-dia

  2. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    2,804
    The opening of the waterpark was scheduled for this March but pandemic-related restrictions in the countries where the attractions are being manufactured has caused the opening to be pushed back to sometime in the second half of 2021.

    Source: http://jornaldiadia.com.br/2020/2021/01/31/acqualinda-volta-a-ser-destaque-internacional/

  3. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    2,804

  4. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    2,804

  5. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    2,804




  6. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    2,804

Page 1 of 3 Previous FirstFirst 1 2 3 LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts