Local Name:
عالم وارنر براذرز أبوظبي
Budget:
1B
Announced:
26 Sep 2007
Construction Start:
15 Jul 2015
Opening:
2018
Location:
Abu Dhabi, UAE
Area:
21 ha
Developer:
Miral Asset Management
Operator:
Farah Experiences
Feasibility Study / Consultants:
Aecom, Electrosonic, Louis Berger
Contractors:
NSCC International, Sanderson Group, Six Construct
Ride Suppliers:
Intamin, WhiteWater, Zamperla
Other Suppliers:
OmniTicket Network, TAA Group, Tejix, WhiteLight
  1. Official park logo:

  2. Warner Bros Abu Dhabi themed lands:

    1. Metropolis & Gotham City:
    These two interconnected areas of the park will be inspired by DC Super Heroes and Super-Villains.

    2. Cartoon Junction, Bedrock & Dynamite Gulch:
    Each of these lands will be themed around characters and brands from Looney Tunes and Hanna-Barbera.

    3. Warner Bros Plaza:
    Reminiscent of old Hollywood, it will evoke the rich history of Warner Bros Studios


  3. "We’re 60 per cent complete and on track to launch in 2018,” said Mohamed Abdullah Al Zaabi, CEO of Miral.
    Pics and a video of the park's construction can be found on:
    http://gulfbusiness.com/pictures-warner-bros-world-theme-park-takes-shape-at-abu-dhabi/

  4. Internal artist impressions








  5. Isn't the second coaster the same Mack spinning as the one in Knott's Berry Farm? It looks like the same layout.

  6. Dubaidave is offline themeparX Top Investigator
    Join Date
    Mar 2012
    Posts
    36
    theres some coaster track in there





  7. On what do you base this opinion? We are still early 2017, I have visited site and works are progressing as per schedule. Some rides have already (are in the process of) beingput in, civil works are nearly done. I'd say 2018 is realistic.

  8. Hey guys,

    I've seen a few ask when it will open. Since it has been said as 2018. In UAE that means December 2018 they will have 4-5 rides open with the remainder to follow in 2019 with 1-2 rides opening per month.

    If you don't believe me look at the track record with Ferrariworld, IMG, Legoland, Motiongate and Bollywoodland.

    Don't be surprised if for some reason it even gets delayed to 2019 Q1-2. It's very possible. Realistically, if you want to visit with everything working, you would do better to visit in 2019 Q3-4