Send your construction pics to uploads @ themeparx.com

Reply to Thread
Page 9 of 30 FirstFirst ... 7 8 9 10 11 19 ... LastLast
Posts 81 - 90 of 293
  1. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,604
    A new local news video (the first source below) gives us a great look at new renderings of the indoor Kung Fu Panda area and the video shows the work taking place on the building's structure. Note that these renderings are showing the main indoor area but connected to that in the back is a large indoor Kung Fu Panda boat ride which is not pictured.



    A couple of bonus construction photos of the park





    Safety inspection taking place



    Sources: http://www.dayuntongzhou.com/web/ct12794 and https://m.weibo.cn/5331322043/4367081149205803 and https://mp.weixin.qq.com/s/k4d-X4n3u5CQNo6hP-KolQ

  2. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,604
    Excellent new photos showing the rapid construction taking place

    The first supports have gone up for the Transformers roller coaster - can you spot them?




  3. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,604
    On this first image the left is The Wizarding World of Harry Potter then in front more towards the right where the two closest cranes are is the Waterworld stadium and then behind that is the indoor Kung Fu Panda area





    Source: https://m.weibo.cn/status/4365738640811583

  4. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,604
    Brand new aerial photos of Universal Beijing Resort - the front Universal-branded hotel is beginning to rise quickly! What's the one ride building that hasn't gone vertical yet and is just a pile of dirt?




    The answer is Fast & Furious: Supercharged

    Also we have our first look at a new, much more detailed scale model of the resort. The concept art in the second image is showing the Music Plaza Stage which is designed very similarly to what can already be found at Universal Studios in Orlando. The Music Plaza Stage will be located at the edge of the park's Hollywood themed area and at the intersection of the Transformers and Jurassic World areas. If you look closely enough you can ever spot the Transformers roller coaster in the top right. It seems that the display lights up certain areas of the scale model to correspond to what's being shown on the screen.





    New photos of the north part of the park





    Sources: https://m.weibo.cn/status/4365047180848484 and https://www.instagram.com/guohua30/p/BwHW1HVAVdM/ and https://m.weibo.cn/status/4364889574928931

  5. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,604
    Inverted coaster track is being installed for the park's flagship Jurassic World ride!











    Bonus video showing Kung Fu Panda, Jurassic World and Transformers buildings quickly rising: https://streamable.com/58zss

    Sources: http://video.weibo.com/show?fid=1034:4364224684860762 and https://m.weibo.cn/status/4363936105606095

  6. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,604

  7. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,604
    Recent construction photos show that the glass dome at the Jurassic World area is being built















    Recently released concept art of the first parking garage that will be connected to CityWalk just like in Orlando:






    Sources: https://m.weibo.cn/status/4362072868891969 and https://mp.weixin.qq.com/s/pDbizCd5pKxWtxoPAuqH-Q

  8. Night view of Universal Beijing and subway construction site. by 84003673











  9. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,604
    Some random Universal Beijing updates from this week:

    1. The underground infrastructure for CityWalk was completed ahead of schedule



    2. Mike Davis, Senior Vice President of International Entertainment at Universal Creative, along with Jason Ramsburg, Entertainment Director of Universal Beijing, visited the Beijing Contemporary Music School, which is just up the road from the resort, to potentially work together as part of what would be a cultural exchange and cooperation of musical talent.









    3. Universal Beijing is now active on their official Weibo account (https://weibo.com/u/3937775216) and they now also have an official WeChat account - its WeChat ID is gh_e3b27d6c40ab

    Sources: https://mp.weixin.qq.com/s/6I17-5enxTzPTKQw3sGC1Q and http://news.bjcma.com/xgxw/gjhz/2019/04/02/14148.html

  10. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,604


    According to the latest local news report, much of the park's main steel structure and infrastructure will be completed this year. Most of the ride installation will take place in 2020. In addition there's an onsite nursery for foliage that will eventually be used as the park's landscaping and by May of this year the entire nursery will be operational with more than 2,600 shrubs and trees.













    Source: http://www.bj.xinhuanet.com/bjyw/2019-03/29/c_1124298744.htm

Page 9 of 30 FirstFirst ... 7 8 9 10 11 19 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts