Send your construction pics to uploads @ themeparx.com

Reply to Thread
Page 13 of 13 FirstFirst ... 3 11 12 13
Posts 121 - 128 of 128
Local Name:
الأعلام الستة دبي
Budget:
710M
Announced:
04 Mar 2008
Construction Start:
03 Jul 2016
Opening:
on hold
Location:
Dubai, UAE
Area:
19 ha
  1. The Six Flags Dubailand design by Gary Goddard looked so much better!



    Source:
    http://www.garygoddard.com/

  2. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,344
    Most recent satellite imagery of the site:



    Source: https://goo.gl/maps/ti4BwGPydWG2

  3. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,344
    Six Flags Dubai location shown in comparison to the rest of Dubai Parks and Resots:



    Source: http://www.theparks.it/dubailand-p1142/notizie/2016/07/rivelazioni-su-six-flags-dubai-2019-n1971/

  4. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,344
    Some additional renderings that can give you a better idea of the specific rides to expect at the park:















    Source: http://www.parqueirosanonimos.com.br/2016/05/novas-imagens-conceituais-do-six-flags.html

  5. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,344

  6. Any pictures from the Six Flags construction site?



  7. Planned to open in late 2019, Six Flags Dubai will be the fourth theme park at the Dubai Parks and Resorts destination and will include 27 rides and attractions for all ages across six themed zones
    Source:
    https://content.sixflags.com/dubai/dubai-parks-and-resorts-breaks-ground-on-the-construction-of-six-flags-dubai-theme-park/

  8. admin is online now Administrator
    Join Date
    May 2011
    Posts
    147

    Six Flags Dubai

    Status: under construction

Page 13 of 13 FirstFirst ... 3 11 12 13

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts