Send your construction pics to uploads @ themeparx.com

Reply to Thread
Page 3 of 13 FirstFirst 1 2 3 4 5 ... LastLast
Posts 21 - 30 of 130
Local Name:
الأعلام الستة دبي
Budget:
710M
Announced:
04 Mar 2008
Construction Start:
03 Jul 2016
Opening:
on hold
Location:
Dubai, UAE
Area:
19 ha
  1. At the moment it can't be denied it's a terrible location. Even if you agree with your argument that the area will grow in the future it's still a terrible location.

    Strategically you need a balance for planning a city, yes you have to think of the future - but even just looking at a basic map the stategic decision to place this park so far from the main downtown area is bewildering.

    Whilst waiting for the area around it to build up, etc (which could be a decade or more) you lose volume of money, goodwill of any fan base, and a general lack of buzz for the park.

    Whoever decided to locate the park in this area needs to hand their heads in shame.

    I do agree, one hope maybe to extend the metro line to the area - if this is possible. Transport options to the parks are diabolical, even some taxi drivers have never heard of it.

  2. Planning long term is great. As long as you offer a temporary solution until you grow in to your environment.

    This has not been done.

    There is nothing out there at the moment, so it is not easy to get to, nor do people want to go.

    And even with deep pockets, losing hundreds of millions of dollars each year can only happen for so long.

    Extend the metro line now, and it will certainly help a lot. Or at the least, offer a free shuttle from Dubai Mall, Battuta Mall and Mall of the Emirates.

  3. Dubai is slated to grow and expand towards this site... Dubai Parks & Resorts is located in a great long-term location (halfway between Dubai and Abu Dhabi, near the future Itl airport, near the Expo 2020 site, along the main Sheikh Zayed Road, and just south of Palm Jebel Ali which will rival Palm Jumeirah in the future). Metro will link it one day too.

    They planned long term. They always do, they don't expect immediate profits.

  4. In hindsight this whole project has been built in the wrong place.

    Dubai has so much space, that it beggars belief those in charge chose such a poor location away from the main central locations.

    Had it been more central, you would have seen more visitors popping in. As it is, the distance, location, makes it less likely you get people visiting off the cuff. Shame as the project has so much potential.

  5. So, I think that the days of this park are coming to an end. Project people are losing their jobs.

  6. uaeprojects is offline themeparX Top Investigator
    Join Date
    Aug 2016
    Posts
    40
    Not always since its exclusive for sf, its been designed by sf team, not all of them can be placed in another theme park.

  7. There is always a way to re purpose a ride or attraction.

  8. Wonterland is offline New User
    Join Date
    Jan 2019
    Posts
    1
    Quote Originally Posted by Guest View Post
    SFDXB is cancelled. Official announcement once DXB Ents has completed legal formalities with investors.

    Existing purchased rides (there are several) will be displaced between Motiongate and Bollywood (or other Dubai Holdings / Meraas assets).

    Bollywood will transition in to a pay-per-ride attraction later this year (Global Village model).

    DPR is currently restructuring it's park operations to move away from direct hires to 3rd party workforce. Front line team have been given until end of July to find their own accommodation and transport in a move that many view as a deliberate tactic to force resignations and avoid mandatory redundancies, of which there have just been 100+. It will be interesting to see what this does to service standards which are already suffering with the loss of many of the original experienced team to other projects.
    Can you please explain where you got this info from? Because honestly, with the info that uaeprojects is bringing up, i find this very hard to believe.

  9. uaeprojects is offline themeparX Top Investigator
    Join Date
    Aug 2016
    Posts
    40
    I know very well the team behind the project from the head office of Merass, they are working on it to enhance the design, believe me its all rumors and I saw the new design the everything, be patient and all the information with details will be published in the news.

    NO WAY TO USE SF RIDES IN OTHER THEME PARKS SINCE SOME OF THEM ARE MADE EXCLUSIVELY OF SF which you can not find in any other theme parks, only in sf in America and soon in Dubai.

  10. It was obvious; why came as a surprise?

    Cruious to read uaeprojects ‘s insider comments

Page 3 of 13 FirstFirst 1 2 3 4 5 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts