    Here's some very concrete description of what's been done and what's going on on the site, right now. The source of this information is the People's Daily/Shanghai Daily: http://english.peopledaily.com.cn/90882/7781457.html

    Construction crews have almost finished grading the uneven land to prepare it for the large-scale construction in the next step. To reduce subsidence and create a safe amusement park, the builders have adopted a so-called vacuum-preloading method on the 1.68-square-kilometer plot.

    They divided the area into 44 parts and inserted pipes into the land to draw ground water. The builder compared the work to "doing embroidery" on the land and said it meets the standard of an airport runway. The land will not sink by more than 1 centimeter for at least 50 years, according to the builders.

    About 98 percent of the necessary soil has been removed to form the river around the theme park, and 84 percent of the soil of the future inner lake has been removed.

    Construction on Tanghuang Road and Hangcheng Road, the eastern and southern border roads of Disneyland, will be completed and open to traffic by the end of this month, the Pudong New Area construction authorities said yesterday.

    The Pudong government is responsible for the construction of 11 Disney-related road projects.

    The other nine projects, including the Shenjiang lane elevated road, a bus hub and the major entrance road, are expected to be completed by June 2014.

    The 11 road projects, which involve streets totaling 40 kilometers, will cost about 9.4 billion yuan (US$1.5 billion). A total of 492 households and 133 enterprises need to be relocated to make way for the road projects.

  2. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    420

    Recruitment started!

    SHANGHAI Disneyland, scheduled to open in 2015, has kicked off the first round of recruitment, the resort announced yesterday.

    The future theme park in Pudong's Chuansha area has 100 job openings for highly skilled specialists in engineering, design and other fields to assist in the initial construction of the park.
    Source:
    http://www.shanghaidaily.com/nsp/Metro/2012/03/27/Disney%2Bstarts%2Bfirst%2Brecruitment/

  3. shanghaiwoman is offline Curious Chap
    Join Date
    Jan 2012
    Posts
    4
    Here is a collection of very good videos from YouTube showing details about Shanghai Disneyland, this is just such an awesome project!!






  4. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    420
    2011-12-31 09:12

    SHANGHAI Disneyland will start taking shape in the spring, with work set to begin on attractions, government officials said yesterday.

    Preparatory work on the first Disneyland on the Chinese mainland began in April, with the theme park scheduled to open in 2015.

    This stage of the project is set to cost 29 billion yuan (US$4.6 billion), including the park, hotels and leisure facilities. Other stages are planned afterwards.

    Jiang Shujie, deputy director with the Shanghai Construction Commission, said nearly 3 billion yuan has been spent on preparatory construction.

    This includes building roads and drainage systems, as well as sightseeing and traffic structures.

    Preparatory work should be finished by the spring, after which builders can move on to Disneyland attractions, Jiang said.

    Work has begun on a 10-kilometer waterway attraction that will enclose the site. A 5-kilometer stretch is currently being dug at the northwest of the site, Jiang said.

    He added that two elevated roads connecting the site to the S1 and S2 highways are under construction and could open next April.

    A Metro link will also be built.

    Authorities have already revealed a rough plan indicating how Shanghai Disneyland could look, attracting great interest.

    Jiang said the bidding process for the detailed design had begun, but did not elaborate on likely candidate designers.

    The city said it has spent about 100 billion yuan this year on major government-backed construction projects.

    These were mostly aimed at upgrading traffic and other facilities to boost the local economy.

    Officials said there will be a substantial increase in next year's budget for similar work.

    Around 30 tunneling machines are currently at work in Shanghai, as the city builds more subway lines and other tunnels, said the construction authority.

    By 2015, the Metro network will have grown from 420 to 500 kilometers, said Jiang.
    Source:
    http://english.eastday.com/e/111231/u1a6287270.html

  5. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    420

  6. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    420

  7. research007 is offline themeparX Top Investigator
    Join Date
    Oct 2011
    Posts
    420

  8. admin is online now Administrator
    Join Date
    May 2011
    Posts
    154

    Shanghai Disneyland

    Status: under construction

Page 82 of 82 ... 78 79 80 81 82

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts