Send your construction pics to uploads @ themeparx.com

Reply to Thread
Page 1 of 5 1 2 3 ... LastLast
Posts 1 - 10 of 49
Local Name:
سي وورلد أبوظبي
Budget:
1.55B
Announced:
13 Dec 2016
Construction Start:
Opening:
2022
Location:
Abu Dhabi, UAE
Area:
20 ha
  1. Michael is online now themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,502

  2. Michael is online now themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,502

  3. Michael is online now themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,502
    New, but unfortunately not that clear, aerial view of the park shows that there's a lot of work taking place and I am unable to confirm but I believe the park has gone vertical at least to some extent.



    Source: https://www.instagram.com/p/B0_bQPNAPjI/

  4. Michael is online now themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,502





  5. New update


  6. 20th of march 2019











  7. In the Loop has a construction update video on this (along with Six Flags Dubai)

  8. SeaWorld AD will be managed by SeaWorld. This makes it a different proposition to the other Farah Leisure attractions which are managed within the group.

  9. Michael is online now themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,502
    On the ground view of the construction equipment



    Source: https://twitter.com/onlinehyde/status/1088882749044387841

Page 1 of 5 1 2 3 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts