Send your construction pics to uploads @ themeparx.com

Reply to Thread
Page 1 of 7 1 2 3 ... LastLast
Posts 1 - 10 of 63
Local Name:
인천 로봇랜드
Budget:
1.2B
Announced:
13 Nov 2007
Construction Start:
26 Sep 2013
Opening:
unknown
Location:
South Korea
Area:
Developer:
Operator:
Feasibility Study / Consultants:
Designers:
Contractors:
Ride Suppliers:
Other Suppliers:
  1. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,446
    Extensive ride testing, drills and other rehearsals are taking place at Robot Land ahead of the park's opening on September 7, 2019:

















    Sources: http://www.newsjinju.kr/news/articleView.html and https://www.instagram.com/p/B1QIhJmFQrm/

  2. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,446

  3. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,446


    It turns out that roads being built are not the real reason causing Robot Land's delayed opening in Masan. Robot Land has been apparently forging documents that indicate that the necessary sewage treatment facilities have been completed which is actually not the case (as of early August they are now almost completed). Robot Land forged the documents in order to get approval for an opening in September 2019.



    Source: https://news.v.daum.net/v/20190804130005950


  4. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,446
    The opening of Robot Land in Masan, which was supposed to take place on July 26, has now been delayed until September due to the roads leading to the park not being ready to handle the amount of traffic.













    Sources: https://www.yna.co.kr/view/AKR20190625101000052 and http://www.idomin.com/news/articleView.html?idxno=700908 and https://www.instagram.com/p/BzFhooOgUhi/ and https://www.instagram.com/p/BzFbVA3BaG9/

  5. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,446
    Robot Land in Masan will be opening at the end of July



    Park map (click/tap image to view at full size)


    Ride directory: http://gnrobot.or.kr/document/themepark3

    Sources: https://www.newscj.com/news/articleView.html?idxno=643137 and http://gnrobot.or.kr/post/2148


  6. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,446
    Robot Land Masan











    There unfortunately seems to be a potential issue with "Rapid Train", a Zamperla Thunderbolt model roller coaster at the park. According to a recent article, during recent testing of the ride some of the supports began to shake "violently" and make noise. An official from the park has said in a statement (paraphrased translation) "We are trying to guarantee the safety of the guests. There is no safety problem if slight shaking occurs."



    Sources: https://www.instagram.com/p/ByxLUzvnKD8/ and http://ilyo.co.kr/?ac=article_view&entry_id=338122

  7. Nice! There ARE robots after all

    Thanks for pics

  8. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,446
    Robot Land Masan







    Source: https://www.instagram.com/p/ByR0hMLDc1D/

Page 1 of 7 1 2 3 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts