Local Name:
PortAventura expansión
Budget:
$110M
Announced:
13 Mar 2014
Construction Start:
Feb 2015
Opening:
07 Apr 2017
Area:
8 ha
  1. Tala is offline themeparX Top Investigator
    Join Date
    Nov 2015
    Posts
    121

  2. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,500
    Press Release from 5/5/2016 gives some more insight into the state of construction overall.


    As of today the shield, over 100 m2 in size, takes pride of place at the front of the tallest roller coaster in Europe.
    Not sure we had seen a month of scheduled opening as yet? Maybe I missed it!
    Ferrari Land (the resort’s third theme park scheduled to open in April 2017)
    The Ferrari Land construction project continues to race ahead. The land and foundations upgrading work is complete and the team is now working on buildings and installations for the attractions. The first and most visible of these attractions is the vertical accelerator (completion is scheduled within the next few weeks).
    During today's visit, Luís Valencia, Director of Development at PortAventura World and Ferrari Land project manager said: "We are currently involved in construction of the buildings that will shape the area dedicated to traditional Italy, such as the trattoria, and the area designated for the simulators. Once the construction phase is complete, we will start working on the theming of the buildings".
    With regard to the attractions, Luís Valencia explained: "in addition to the accelerator, we are forging ahead with the construction of an electric car circuit, which will be another star feature of the new park. The track will cover a distance of more than 500 metres and the vehicles are based on Ferrari GP racing cars”.


    Source: https://s3-eu-west-1.amazonaws.com/portaventura-world-production-files/wilson_cms/documents/documents/000/003/034/original/Ferrari_Land_press_release.pdf?1462524399

  3. Tala is offline themeparX Top Investigator
    Join Date
    Nov 2015
    Posts
    121
    New updates!:



    Some photos from another site:




    Source:
    http://www.pa-community.com/parques/ferrari-land-portaventura/fotos

  4. Tala is offline themeparX Top Investigator
    Join Date
    Nov 2015
    Posts
    121
    I took screenshots of the video that was posted previously. I am amazed at the height of the coaster!




  5. Tala is offline themeparX Top Investigator
    Join Date
    Nov 2015
    Posts
    121
    More updates:






  6. tronik6 is offline Senior Park Investigator
    Join Date
    Apr 2012
    Posts
    12
    crowned highest point

  7. Tala is offline themeparX Top Investigator
    Join Date
    Nov 2015
    Posts
    121
    More updates! A lot of lifting going on...






  8. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,500



    The construction workers have been working fast all week, and the track has been added very quickly (when the weather permits).
    A large structure appeared next to the main tower, which appears to be its 5th storey. It has so far been erected on the floor and will be placed on the top of the tower in the next few days. It seems significantly easier to construct part of the tower on the ground, before simply lifting it up and placing it on top fully assembled!
    Source: http://www.europeancoasterkings.com/ferrari-land-update-2/

  9. More


  10. Tala is offline themeparX Top Investigator
    Join Date
    Nov 2015
    Posts
    121
    New video with more details about Ferrari Land:



    Some screenshots from the video:




    The attraction will open in 2017.