Local Name:
大樹灣水上樂園
Budget:
100M
Announced:
Construction Start:
05 Nov 2015
Opening:
2019
Location:
Hong Kong
Area:
6 ha
Developer:
Ocean Park Corporation
Operator:
Ocean Park Corporation
Feasibility Study / Consultants:
Contractors:

  1. MrFacipieri is offline themeparX Top Investigator
    Join Date
    May 2016
    Posts
    43
    The new metro station just outside the park is now open

  2. Ho Nok is offline Park Investigator
    Join Date
    May 2017
    Posts
    4
    Lakeside Chill, Ocean Park 40th Anniversary (2017) new attraction




  3. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,641

  4. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,641
    The all-weather Water World will stay open late to offer night attractions for the local community and international tourists
    Source: http://www.attractionsmanagement.com/detail.cfm?pagetype=featuresonline&featureid=31730&mag=Attractions%20Management&linktype=story&source=none&ref=n

  5. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,641

  6. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,641

  7. Video taken yesterday of the Rollercoaster that goes over the cliff shows the water park construction in the background.




  8. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,641
    Construction of the waterpark is progressing "smoothly" but the land turned out to be more swampy than expected and even though a solution to dealing with the swampy land has been found, completion of the waterpark has been delayed by four to five months with an expected opening in either 2019 or 2020.

    Source: http://vancouver.singtao.ca/929661/2017-01-10/post-%E6%B5%B7%E6%B4%8B%E5%85%AC%E5%9C%9240%E5%91%A8%E5%B9%B4%E5%84%AA%E6%83%A0%E3%80%80-40%E5%85%83%E9%96%80%E7%A5%A8%E6%98%8E%E6%97%A54%E6%99%82%E9%96%8B%E6%90%B6/?variant=zh-cn

  9. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,641
    Construction progress photos from The Theme Park Review's recent visit:







    Source: http://www.themeparkreview.com/forum/viewtopic.php?p=1763634#p1763634

Page 7 of 10 FirstFirst ... 5 6 7 8 9 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts