Send your construction pics to content_at_themeparxdotcom

Search Results:

Type: Posts; User: Redbeanpaste

  1. Posts
    1,113
    Views
    1,968,991
    New rendering (?) of interior and surroundings of the metro station. The escalator has a longer than usual buffering area, not sure if it's simply a rendering glitch or some new design to improve safety during peak hours.





    Source: http://www.ditiezu.com/thread-512344-5-1.html
  2. Posts
    1,113
    Views
    1,968,991
    Quick update on the public transit station of the park and a rendering of entrance.





    Source: http://www.ditiezu.com/thread-512344-5-1.html
  3. Posts
    1,113
    Views
    1,968,991
    According to this blogger, http://m.blog.sina.com.cn/s/blog_752deabf0102ydg9.html#page=3, the steel structure just lifted is of either Jurassic World or Minions (construction bid #2) . Kung Fu Panda is part of bid #3. The blogger didn’t cite any sources, but the tenderer for bid #3 does confirm their work on Kung Fu Panda and Waterworld. http://www.chinaonebuild.com/templates/content/index.aspx?nodeid=40&page=ContentPage&contentid=2550

    Below is an supposedly recent aerial shot over the park. The entire site seems to be covered wherever possible to reduce dust blown up into the air.



    Source: http://gaoloumi.cc/forum.php?mod=viewthread&tid=3172903&extra=page%3D1
  4. Posts
    1,113
    Views
    1,968,991

    The above is an on-site project management building, probably will be of administrative purpose after the construction is completed.

    Below are three photos already in #174 but of higher res. The two domes of the bottom photos is the transit entrance connecting Line 7 and Batong.



  5. Posts
    1,113
    Views
    1,968,991
    Hey Michael, new to the place and this is amazing! I'm actually going to live in Beijing for a while now, and my friend told me about this upcoming Universal Studio. Being a theme park lover myself, I could definitely run down to the construction site and snap some photos (I wish I had a drone though). And if you ever need some basic translation from the local news I could also help. The only update I can contribute right now is that metro Line 7 and extension of Line Batong, both of which will connect to the transit hub at the park, are slated to open by the end of 2019. Not sure if it will help with the construction in any meaningful way, but definitely better than the park waiting for the transit.
Results 1 to 5 of 5