Send your construction pics to uploads @ themeparx.com

Reply to Thread
Page 1 of 4 1 2 3 ... LastLast
Posts 1 - 10 of 35
Local Name:
مرسى العرب
Budget:
1.7B
Announced:
14 May 2017
Construction Start:
Opening:
unknown
Location:
Dubai, UAE
Area:
23 ha
Developer:
Dubai Holding
Operator:
Feasibility Study / Consultants:
Designers:
Contractors:
Ride Suppliers:
Other Suppliers:
  1. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,557

  2. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,557

  3. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,557

  4. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,557

  5. I have been there the past two weeks. Yes, there are starting.... the little harbour and part of the JBH are will be demolished... Plans are either another Hotel or an apartment building... not certain yet...

  6. Al Marsa isn’t new though as it was built before they did the refurb.

    Interesting though is Cove Beach next door is being demolished now. Guess it’s starting....

    https://www.instagram.com/p/BoTBQzwHpVI/?utm_source=ig_share_sheet&igshid=gn65klbyzcdt

  7. So the one fact that I found out is that one restaurant in the renewed Jumeirah Beach Hotel is called Al Marsa :-)

  8. Maybe they don´t reveal anything yet as it is still a bit ahead... who knows... lets wait and see...

  9. I spoke to Jumeirah Beach hotel today as we are planning to stay their Easter 2019.
    They said there were no works planned !!!
    All a bit confusing.

  10. How far away will it be from the Burj al Arab and JBH?

Page 1 of 4 1 2 3 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts