Send your construction pics to uploads @ themeparx.com

Reply to Thread
Page 1 of 3 1 2 3 LastLast
Posts 1 - 10 of 26
Local Name:
海南海洋欢乐世界
Budget:
1.6B
Announced:
29 Aug 2010
Construction Start:
30 Mar 2011
Opening:
2019
Location:
Lingshui, China
Area:
109 ha
Developer:
Operator:
Feasibility Study / Consultants:
Designers:
AES, CCDI Group, Crossley and AGA, Forrec, Shenzhen Overseas Town Tourism Planning And Design Institute
Contractors:
CEFOC, China Construction First Building, Guangzhou Tian Li Construction
Ride Suppliers:
Other Suppliers:
  1. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    930
    Today the countdown began for the opening of Hainan Ocean Paradise's waterpark, "Mytikas Waterpark." The opening is now planned for December 30, 2018, which is just over 100 days away.



    Source: https://mp.weixin.qq.com/s/313ynLnUf7obJkO7wx_q5A

  2. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    930
    Construction is nearing completion on Hainan Ocean Paradise's 'Mytikas Waterpark'



    Construction progress on the theme park:









    Sources: http://www.hainan.gov.cn/hn/yw/zwdt/sx/201808/t20180806_2719388.html and https://mp.weixin.qq.com/s/-wBZUWeMElQBICmw3nD67A and http://m.cnjen.cn/newswx/tour/201808/595422.shtml

  3. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    930
    Looks like the opening of the waterpark has been pushed back from December 2018 to a potential soft opening in January 2019

    Source: https://www.linkedin.com/feed/update/urn:li:activity:6428016395316977664

  4. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    930
    New photos of Hainan Ocean Paradise's waterpark, which is named "Mytikas Waterpark" and is themed to Greek mythology. Mytikas is the name of the highest peak of Mount Olympus, the highest mountain in Greece and according to Greek mythology Mytikas is home to the Greek gods.











    Source: https://mp.weixin.qq.com/s/G_bLYiAB2lc9Ln0wDMQewA

  5. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    930
    BREAKING: Hainan Ocean Paradise's waterpark will be opening in December 2018!



    All waterslides and facilities have been installed at the waterpark and the construction workers are now focusing on landscaping, the interior decoration of the park and testing of the rides.

    Construction of both the waterpark and adjacent theme park continue to accelerate with the waterpark currently 80% complete and the theme park 60% complete.

    Source: http://news.sanya.fang.com/open/28775374.html




  6. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    930







  7. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    930
    Construction of the park has accelerated but despite that, the opening has now been pushed back to 2019.

    Source: https://mp.weixin.qq.com/s/30k9hY2YNenD103n-JOLjg

  8. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    930
    Officials from the local Lingshui government recently visited the site and are working to help accelerate construction of the marine life park and waterpark. To ensure that Hainan Ocean Paradise opens as soon as possible, they are strengthening coordination and scheduling, increasing the number of workers and equipment, and streamlining the construction approval process.



    Sources: http://www.hinews.cn/news/system/2018/03/14/031427174.shtml and https://360.mafengwo.cn/travels/info.php?id=8763914

  9. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    930
    Hainan Ocean Paradise has opened a 5,000 square meter marine animal rescue facility at the park called Blue Ocean Conservation & Rescue Center, which cost over $6 million to build. Hainan Ocean Paradise is working with both local and international organizations and government agencies, including Vancouver Aquarium in Canada, to make the rescue and conservation program as successful as possible. The park itself is not open yet and is still under construction. Similarly, the opening of the rescue center prior to park opening is also the plan for SeaWorld Abu Dhabi.









    Source: https://mp.weixin.qq.com/s/gCbWqjvqSneD0No1qMVjOg

Page 1 of 3 1 2 3 LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts