Send your construction pics to uploads @ themeparx.com

Reply to Thread
Page 13 of 13 FirstFirst ... 3 11 12 13
Posts 121 - 127 of 127
Local Name:
Budget:
136M
Announced:
08 Jul 2014
Construction Start:
14 Sep 2017
Opening:
2019
Location:
Rust, Germany
Area:
30 ha
Developer:
Europa-Park GmbH & Co Mack KG
Operator:
Europa-Park Freizeit & Familienpark and Mack KG
Feasibility Study / Consultants:
  1. Hotel Name:




    Waterpark Entrance Area:


    Waterpark Name Announcement:
    https://www.youtube.com/watch?v=85pt0zgGFVM
    (In swedish, but with english subtitles)

  2. HazelJune is offline themeparX Top Investigator
    Join Date
    Jan 2017
    Posts
    237

  3. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,159
    Against the backdrop of 30,000 feedbacks from more than 10 years of ongoing visitor surveys, where 60 per cent of the respondents asked for a water park, the decade-long, natural and continuous growth of the Europa Park is to be continued with a complementary water park.
    Based on expert estimates, it can be assumed that the indoor area will occupy a maximum of 3,000 to 4,000 and the outdoor area a maximum of 500 to 1,000 visitors at the same time. A total of 400,000, followed by 600,000 guests a year. About 80 per cent of the visitors are to come from hotels of the Europa-Park and the surrounding area.
    Source: https://www.zvt-ringsheim-rust.de/de-de/buergerforen_wasserpark/projektbeschreibung

  4. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,159

  5. HazelJune is offline themeparX Top Investigator
    Join Date
    Jan 2017
    Posts
    237


  6. admin is offline Administrator
    Join Date
    May 2011
    Posts
    148

    Europa-Park expansion

    Status: Under Construction

Page 13 of 13 FirstFirst ... 3 11 12 13

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts