Local Name:
Europa-Park Uitbreiding
Budget:
136M
Announced:
08 Jul 2014
Construction Start:
14 Sep 2017
Opening:
2019
Location:
Rust, Germany
Area:
30 ha
Developer:
Europa-Park GmbH & Co Mack KG
Operator:
Europa-Park Freizeit & Familienpark and Mack KG
Feasibility Study / Consultants:
Designers:
Mack Solutions, Paragon Creative
Other Suppliers:
  1. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    937


    Monday, August 13, 2018, the first of the five wooden support beams of the roof of the future aquatic universe " Rulantica " was installed. The wooden piece is 87 meters long and consists of two rooms of 37 and 50 meters. The latter was raised by a special crane and placed on one of the concrete columns.

    By the end of the week, the five support beams, each weighing 110 tonnes, will be in place and will form the roof of the future roof. Currently, " Rulantica " is the only building site in Germany where wooden beams with such dimensions are used.


    Source:http://wonderworldweb.over-blog.com/2018/08/550-tonnes-de-poutres-en-bois-installees-pour-soutenir-le-futur-toit-du-parc-aquatique-rulantica-lundi-13-aout-2018-la-premiere-des.

  2. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    937
    Every week its new important step on the site site! 🚧

    Today, it is the impressive wooden beams that will support the roof of the water park that are mounted on the ground and will soon be installed! 🏗


    Source: https://www.facebook.com/rulantica.official/photos/a.414270385695587.1073741828.185671501888811/509831852806106/?type=3&theater

  3. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    937

  4. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    937
    Video from July 19th














  5. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    937

  6. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    937

  7. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    937

  8. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    937

  9. HazelJune is offline themeparX Top Investigator
    Join Date
    Jan 2017
    Posts
    239




    The designs are approved, all companies are under contract and the catering concepts are available. The schedule for Krønasår is tight, but we are in good time.
    https://twitter.com/ThomasMack_EP

Page 1 of 5 1 2 3 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts