Send your construction pics to uploads @ themeparx.com

Reply to Thread
Page 11 of 13 FirstFirst ... 9 10 11 12 13 LastLast
Posts 101 - 110 of 130
Local Name:
Остров Мечты
Budget:
1.5B
Announced:
27 Nov 2015
Construction Start:
17 Mar 2016
Opening:
Sep 2019
Location:
Moscow, Russia
Area:
26 ha
Developer:
Regions Group
Operator:
Regions Entertainment
Feasibility Study / Consultants:
Contractors:
Other Suppliers:
  1. Sebastian is offline themeparX Top Investigator
    Join Date
    Feb 2017
    Posts
    127
    The park has confirmed that they will build one Launch Coaster from Intamin called "Dark Ride Coaster", which will feature 2 inversions. The coaster will be 24m high, 80km/h fast and 557m long.

    Sources:
    https://www.intaminworldwide.com/download/1775/
    https://www.instagram.com/p/BXZ6Orjjss5/?taken-by=ostrovmechti

  2. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,071
    The park won “BEST PUBLIC SPACE” at the Russian Innovations Awards.

    A major redevelopment of the Soviet-era Nagatino Park, Dream Island is designed as the first large-scale leisure destination in Russia, expected to be visited by up to four million people annually.
    So this is the Russian government giving themselves an award for something that isn't even completed

    Source: http://www.chapmantaylor.com/news/moscows-dream-island-wins-best-public-space-at-2017-good-innovations-awards

  3. Sebastian is offline themeparX Top Investigator
    Join Date
    Feb 2017
    Posts
    127
    Two current videos about the project:





  4. 4th August was a working day (Friday). Why are there no construction workers on site?

  5. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,071
    This drone footage is from 4th August.








  6. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,071
    This twitter user thinks there has been no construction on site since July. Does anyone know anything about this?

    The "Dream Island" construction in the Nagatinskaya floodplain is frozen. All the loot stolen. The first photo is July, the second photo is today's photo. Neither the leader nor the technology




    Source: https://twitter.com/borman783/status/903640086738325505

  7. HazelJune is offline themeparX Top Investigator
    Join Date
    Jan 2017
    Posts
    237






  8. Construction timeline:

    July 2017: Foundation structure installation
    October 2017: Formation of the park's topographic landscape is completed
    October 2017: Glass domes installed
    January 2018: Ride installation begins
    July 2018: Completion of all monolith roofworks
    August 2018: Decoration of interior
    September 2018: Grand opening

    Sources: http://dreamisland.ru/progress and https://www.facebook.com/ostrovmechtipark/photos/a.194658397605689.1073741828.177561455982050/261910404213821/

  9. More artwork. Source:
    http://dreamisland.ru/en




Page 11 of 13 FirstFirst ... 9 10 11 12 13 LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts