Budget:
1.5B
Announced:
27 Nov 2015
Construction Start:
17 Mar 2016
Opening:
Sep 2019
Location:
Moscow, Russia
Area:
26 ha
Developer:
Regions Group
Operator:
Regions Entertainment
Feasibility Study / Consultants:
Contractors:
Ride Suppliers:
Other Suppliers:
  1. Sebastian is offline themeparX Top Investigator
    Join Date
    Feb 2017
    Posts
    127
    At the moment itīs freezing cold in Moscow, but the construction isnīt halt due the bad weather condition:









    Source:
    https://vk.com/video-135468707_456239067?list=3132216ec85b7dbdbf

  2. Sebastian is offline themeparX Top Investigator
    Join Date
    Feb 2017
    Posts
    127

  3. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,013
    Ride installation has begun according to the most recent press release from Dream Island.

    The first phase of the installation of attractions began in Dream Island park, it includes the installation of ultra-reliable individual foundations for each of the 29 objects. The work will last 120 days. During this period of time 4 645 piles length of 70 km will be used, it will be unique and innovation technical work in its scope. The production of attractions has already begun, the firsts of them will be brought in Moscow this spring.
    The laboriousness of the installation of foundations for attractions is associated with the peculiarities of the soil in the Nagatinskaya floodplain where the Dream Island Park is located and the different magnitude of dynamic loads from attractions. As part of the foundation of the thematic zone, an unprecedented scale work will be carried out to install 6,800 reinforced concrete piles, 2 155 of which have already been installed. The remaining 4 645 piles will be installed for 29 rides.
    There will be unique and the most modern attractions in Dream Island park, which have never been presented in Russia. One of the first attractions of this level and the most exciting is the Dark Ride Coaster with incredible steep turns. Its trucks are able to rapidly accelerate and develop speeds of up to 80 km / h. The whole route of the hill is completely themed from the landing zone until the end of the fascinating trip. The world's leading developer and manufacturer of high-quality attractions for amusement parks - Intamin Amusement Rides (Liechtenstein) is engaged in the design and installation of the Coaster.
    Source: http://dreamisland.ru/en/news/81/the-first-phase-of-the-installation-of-attractions-began-in-dream-island-park


  4. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,013
    There has been some news regarding funding which seems to have put the project back on track.

    VTB Bank opened a credit line for "Dream Island" holding company in the amount of 37 billion rubles for a period of 7 years. The funds will be spent on the construction of the first stage of the "Dream Island" park, which includes an indoor theme park, an urban promenade with a shopping and entertainment area and a landscape park. The total cost of the first stage of the project is 81 billion rubles. It includes the value of the land plot and the amount of investments in the amount of 43 billion rubles (including 37 billion rubles of VTB), intended for construction, acquisition of rides and working capital.
    The main construction works of the indoor part of the park are planned to be completed by the end of 2018, the interior decoration and landscaping will be finished in the middle of 2019.
    Source: https://www.linkedin.com/pulse/vtb-bank-finances-dream-island-project-alexandra-kiseleva/

  5. There were some delays caused by lack of funding. The park will now open in 2019 instead.

  6. TheRantanplan is offline Curious Chap
    Join Date
    Jan 2018
    Posts
    2
    There is some movement on site again.








  7. Bank credit issues. Construction came to a halt for a while.

  8. Not much construction progress as of recent:








  9. CarlySX is offline themeparX Top Investigator
    Join Date
    Dec 2015
    Posts
    1,013
    Island of Dreams have released this press release about their food offerings, cafes and restaurants.



    Among the establishments there is a two-storeyed central restaurant "Island of dreams", a cafe-bakery "Sweets from Smurfetta", a frost-yogurt bar "Tropicana", a restaurant with favorite dishes of turtle-ninja, a food court "Smurfna vata" in "Smurfs' Village" Italian restaurant, as well as the restaurant "Crystal Heart". There will also be mobile food courts.
    Asian cuisine will be offered in the "Lost World of Dinosaurs" zone, and a large assortment of desserts is in the Hello Kitty cafe. In addition, the main restaurant will host culinary shows and master classes of famous chefs.
    Source: http://www.the-village.ru/village/city/news-city/293842-kafe

Page 6 of 10 FirstFirst ... 4 5 6 7 8 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts