Local Name:
Budget:
750M
Announced:
26 Jul 2013
Construction Start:
17 Dec 2013
Opening:
2019
Location:
KL, Malaysia
Area:
10 ha
  1. I don't think so. Park looks fairly ready. Only the orange coaster needs a lot of work. The coaster itself can be created quite fast, it is usually the theming that takes very long. However, I wouldn't be surprised if they op "Duabai Style". Meaning that the park does open, but with only half of the rides operating (though from the looks of it I think they should be able to open at least 75%)

  2. Apparently according to the facebook comments, one asked "when is the theme park going to be ready" and the uploader replied with "targetting for September to complete everything".

    Sounds impossible. September is just about 4 months away

  3. Michael is online now themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,409


  4. Either Warner Bros or Universal. Two of Disney/Fox’s fiercest competitors. Both with deep connections with Genting.

  5. Danstheboss is online now Senior Park Investigator
    Join Date
    May 2019
    Posts
    13
    Maybe a new theming has been confirmed?







    https://ibb.co/FXvRhp5
    https://ibb.co/G2ZNSwj
    https://ibb.co/smbDQjh


  6. Danstheboss is online now Senior Park Investigator
    Join Date
    May 2019
    Posts
    13

  7. Fast forward to 4:53 to see Scrat’s Nutty Adventure undergoing testing


  8. when is this due to open ?