Send your construction pics to uploads @ themeparx.com

Reply to Thread
Page 12 of 68 FirstFirst ... 2 10 11 12 13 14 22 62 ... LastLast
Posts 111 - 120 of 679
Local Name:
Budget:
750M
Announced:
26 Jul 2013
Construction Start:
17 Dec 2013
Opening:
2020
Location:
KL, Malaysia
Area:
10 ha

  1. Danstheboss is offline themeparX Top Investigator
    Join Date
    May 2019
    Posts
    30

  2. Fast forward to 4:53 to see Scrat’s Nutty Adventure undergoing testing


  3. when is this due to open ?

  4. It seems that the SFX coaster is building up into a corkscrew

  5. ClintonHT is offline Senior Park Investigator
    Join Date
    Jun 2017
    Posts
    14
    To think- that first picture shows what was meant to be parade route. super narrow.

  6. Danstheboss is offline themeparX Top Investigator
    Join Date
    May 2019
    Posts
    30

  7. Danstheboss is offline themeparX Top Investigator
    Join Date
    May 2019
    Posts
    30

  8. croods is offline themeparX Top Investigator
    Join Date
    Jan 2018
    Posts
    44

  9. Danstheboss is offline themeparX Top Investigator
    Join Date
    May 2019
    Posts
    30
    The construction of Resorts World Genting outdoor theme park, which was currently stalled, could be completed by end-2020 or 2021.
    Source: https://www.theborneopost.com/2019/05/15/maybank-kim-eng-infrastructure-growth-to-drive-domestic-tourism/

Page 12 of 68 FirstFirst ... 2 10 11 12 13 14 22 62 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts