Send your construction pics to uploads @ themeparx.com

Reply to Thread
Page 8 of 54 FirstFirst ... 6 7 8 9 10 18 ... LastLast
Posts 71 - 80 of 531
Local Name:
Budget:
750M
Announced:
26 Jul 2013
Construction Start:
17 Dec 2013
Opening:
2019
Location:
KL, Malaysia
Area:
10 ha

  1. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,185


  2. croods is offline themeparX Top Investigator
    Join Date
    Jan 2018
    Posts
    36



    Closing down of the Fox Studio Store.

  3. I was working with one of the ride vendors and at least 1-2 years ago and they already knew the ride theming IP had been lost so were working on a re-branding.

    All IP content will need to be pulled out.

  4. Michael is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    1,185








    The beginning of this Instagram video that was posted minutes ago shows that track for the park's SFX coaster is still sitting in the nearby parking lot untouched since it arrived there about a year ago: https://www.instagram.com/p/Bro1wspFPo2/

    Last but not least we have the first video clip of testing for "Blue Sky Gliding Co" which is an aerial swinging coaster-type ride themed to Rio: https://streamable.com/c7el9

    Sources: https://www.instagram.com/p/BroV_6UhPrt/ and https://www.instagram.com/p/BroujKNhenc/ and https://www.instagram.com/p/BroT795A-Wb/ and https://www.facebook.com/photo.php?fbid=1926695427448830&set=a.107114686073589&type=3&theater

  5. ClintonHT is offline Senior Park Investigator
    Join Date
    Jun 2017
    Posts
    11
    All IP content will need to be pulled out.


    Quote Originally Posted by Wasabihakim View Post
    Ok so does this means Fox/Disney is going to pull the funds however the IPs that are going to be used as the ride can be built because of the contract ?

  6. Wasabihakim is offline New User
    Join Date
    Dec 2018
    Posts
    1
    Ok so does this means Fox/Disney is going to pull the funds however the IPs that are going to be used as the ride can be built because of the contract ?



Page 8 of 54 FirstFirst ... 6 7 8 9 10 18 ... LastLast

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts